342 SE TYRE RDLAKE CITY, FL 32025
Eric Bender
Greystone Construntion Company
County License & State License Expired.
Cody Barrs
Barrs Plumbing Inc
James B Seay
Miller Electric Company
Passed: Fire - Plan Review
Inspected by Cpt. Shane Overstreet
Rescheduled 6/6/2025:Building - Slab
Inspected by Troy Crews
Passed: Building - Slab
Partial Truck Slab And Interior 2 Matts Of Steel
Nw Section
Passed: Electrical - 1st Underground Rough–In
Passed: Plumbing/Gas - 1st Underground Rough–In
Middle Of Building Interior Slab
3 Ramp Sections And More Interior Slab North East Side
Passed: Building - Footer
Done On 5-27-25 Footers
Passed: Engineering - Setbacks
Passed: Building - Masonry Wall Reinforcing
Foundation Walls Partial
Done 6-3-25 Foundation Walls
Se Section Interior And Approach. Slab West Side
Partial Interior And One Exterior
Reminder Of Interior East End Of Building
Tank Farm Slab 2 Foot With Two Mats Of Steel
Passed: Building - Framing
Bolts On Main Framing
Rescheduled 8/14/2025:Plumbing/Gas - Water Pipe
Passed: Plumbing/Gas - Water Pipe
Partial 6 Inch Fire Line And 2 Inch Domestic Water
Passed: Building - Insulation
Passed: Building - Ext Strapping/Wall Sheathing
Metal Shell
Passed: Fire - Fire Rated Wall
First Layer Of Two Hour Wall On Interior Of Building
Potable Water And Fire Line Partial
Passed: Plumbing/Gas - 2nd Rough-In
Passed: Electrical - 2nd Rough-In
Passed: Building - Fire Rated Wall
Reminder Of Firewalls
Passed: Mechanical - Rough In
Offices In Bathroom Areas
Passed: Electrical - Above Ceiling
Passed: Electrical - Permanent Power
Power To Be Turned On Temporarily There Will Be Another Final Inspection With The Permanent Generator Hookup Outside Cannot Release Power Until Driveway Permit Has Final Inspection.
Release to power company
Email Approval To Release Power-- 1.6.26 Mg
Inspected by Mgarber
Added Power Company-- Ok To Release Power-- 1.6.26 Mg
Submitted Power Release through FPL Portal
Inspected by Garber, Melissa
Passed: Fire - Fire Final
Inspected by Cpt. S Overstreet
Passed: Building - Final
*assessments Owed, Pending Direction On City Utilities-- 5.13.26 Mg
Passed: Engineering - Zoning Final