Permit Details

Permit Search

Permit

Roof Replacement or Repair

106 SW WREN CT
LAKE CITY, FL 32025

Permit #
000053345
Application #
71440
Status Completed
  1. Submitted Jun 6, 2025
  2. Issued Jun 10, 2025
  3. Expires Dec 22, 2025
  4. Completed Jun 25, 2025

Property

Parcel #
02678-101
Owner
Johnson David L Iii, Johnson Amanda
Acres
0.19
Subdivision
10th Fairway Villas
Zoning
RSF-2
Flood zone
X
District
5

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0291D
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Re-roof with metal
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
30
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Metal
Florida Product Approval Number
FL36904-R11
Product Manufacturer
Tri County
Product Description
Rib Panel
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Repair Existing
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Final Review - Corrections Needed
  5. Final Review - Payment Needed
  6. Permit Issued
  7. Final Review - Complete
  8. Final Review - Documents Required

Contractors

  • Shawn Raba

    Done Right Roofing Inc.

    License
    CCC1333916
    Title
    Cert. Roofing
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Jun 12, 2025

    Passed: Re-Roof - In Progress

    Replacing Substantial Amount Of Plywood

    Inspected by Troy Crews

  2. Jun 20, 2025

    Failed: Re-Roof - In Progress

    Need Pictures And Affidavit For Final

    Inspected by Troy Crews

  3. Jun 25, 2025

    Passed: Re-Roof - Final

    Inspected by Troy Crews

  4. Jun 25, 2025

    Cancelled: Re-Roof - In Progress

    Inspected by Troy Crews