Permit Details

Permit Search

Permit

New Residential Construction

14784 SW TUSTENUGGEE AVE
FORT WHITE, FL 32038

Permit #
000053293
Application #
70259
Status Completed
  1. Submitted Apr 4, 2025
  2. Issued Jun 23, 2026
  3. Expires Mar 23, 2027
  4. Completed Oct 2, 2026

Property

Parcel #
09816-006
Owner
Hubbart Jesse L, Hubbart Elizabeth T
Acres
5.27
Subdivision
—
Zoning
A-3
Flood zone
A
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0495C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1611
Total Area (Sqft)
2311
Building Height
18
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0288
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Zoning Review - Processing
  4. Plan Review - Processing
  5. Plan Review - Documents Required
  6. Zoning Review - Reviewed
  7. Point Review - Reviewed
  8. Plan Review - Documents Required
  9. Plan Review - Documents Required
  10. Plan Review - Documents Required
  11. Plan Review - Plumbing Approved
  12. Plan Review - Mechanical Approved
  13. Plan Review - Electrical Approved
  14. Plan Review - Building Approved
  15. Plan Review - Reviewed
  16. Final Review - Processing
  17. Final Review - Reviewed
  18. Final Review - Payment Needed
  19. Final Review - Complete
  20. Permit Issued
  21. Permit Renewed

Contractors

This is an owner-builder project.

Inspections

  1. May 12, 2025

    Septic Release Inspection

    Inspected by Health Dept

  2. Jun 16, 2025

    Rescheduled 6/20/2025:Building - Slab

    Inspected by Neonta Anderson

  3. Jun 16, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  4. Jun 20, 2025

    Passed: Building - Slab

    Inspected by Anthony Aslan

  5. Jul 18, 2025

    Failed: Building - Ext Strapping/Wall Sheathing

    Not Ready

    Inspected by Anthony Aslan

  6. Aug 5, 2025

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  7. Aug 5, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  8. Aug 20, 2025

    Passed: Building - Framing

    Windows Not Installed Back Order

    Inspected by Anthony Aslan

  9. Sep 30, 2025

    Passed: Electrical - 2nd Rough-In

    Placement Of Wiring And Boxes Ok, Needs Non Metallic Wires Stripped And Wires Made Ready For Devices By Insulation

    Inspected by Gary Pitzer

  10. Oct 20, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  11. Oct 20, 2025

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  12. Oct 20, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Gary Pitzer

  13. Oct 20, 2025

    Passed: Building - Window Attachment

    Inspected by Gary Pitzer

  14. Nov 19, 2025

    Rescheduled 11/21/2025:Building - Insulation

    Inspected by Callen

  15. Nov 20, 2025

    Passed: Building - Insulation

    Inspected by Christian Allen

  16. Sep 18, 2026

    Cancelled: Building - Final

    Inspected by Nanderson

  17. Sep 24, 2026

    Passed: Building - Final

    Inspected by Christian Allen

  18. Sep 24, 2026

    Passed: Electrical - Permanent Power

    Inspected by Christian Allen

  19. Sep 24, 2026

    Release to power company

    Inspected by Christian Allen