Permit Details

Permit Search

Permit

Roof Replacement or Repair

388 SW BARON GLN
FORT WHITE, FL 32038

Permit #
000053107
Application #
70986
Status Completed
  1. Submitted May 13, 2025
  2. Issued May 14, 2025
  3. Expires Nov 16, 2025
  4. Completed May 20, 2025

Property

Parcel #
03752-436
Owner
Duenas Juan, Duenas Maria
Acres
4.76
Subdivision
Southern Meadows Phase 1
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0390C
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Remove existing shingle roof, replace with new exposed fastener metal roof
Type of structure
Mobile Home
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2100
No. of Stories
1
Roof Pitch
2:12 to 4:12
Is the existing roof being removed?
Yes
Type of New Roofing Product
Metal
Florida Product Approval Number
FL36904
Product Manufacturer
Tri County
Product Description
exposed fastener metal panels
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Corrections Needed
  4. Final Review - Payment Needed
  5. Permit Issued
  6. Final Review - Payment Needed
  7. Final Review - Payment Needed
  8. Final Review - Complete

Contractors

  • Grady M Stephens

    Worthmann Roofing And Gutters

    License
    CCC1336120
    Title
    Cert. Roofing
    Role
    Contractor

Inspections

  1. May 15, 2025

    Passed: Re-Roof - In Progress

    In Progress, Tear Off Nearly Complete, Nailing, And Will Be Peel And Stick Underlayment

    Inspected by Gary Pitzer

  2. May 20, 2025

    Passed: Re-Roof - Final

    Inspected by Gary Pitzer