Permit Details

Permit Search

Permit

New Residential Construction

329 SW CHESTERFIELD CIR
LAKE CITY, FL 32024

Permit #
000052823
Application #
69452
Status Completed
  1. Submitted Mar 27, 2025
  2. Issued Apr 3, 2025
  3. Expires May 13, 2026
  4. Completed Nov 18, 2025

Property

Parcel #
03117-119
Owner
T.s. Fields Properties Llc.
Acres
0.51
Subdivision
Crosswinds Phase 1
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0381D
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1624
Total Area (Sqft)
2256
Building Height
17
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0176
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Zoning Review - Reviewed
  7. Plan Review - Plumbing Approved
  8. Plan Review - Mechanical Approved
  9. Plan Review - Electrical Approved
  10. Plan Review - Building Approved
  11. Plan Review - Reviewed
  12. Final Review - Documents Required
  13. Final Review - Documents Required
  14. Final Review - Documents Required
  15. Final Review - Reviewed
  16. Permit Issued
  17. Final Review - Complete

Contractors

  • Brian T Giebeig

    Trent Giebeig Construction,inc.

    License
    CRC1330693
    Title
    Residential Contractor
    Role
    Contractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Derrick L Williams

    D L Williams Heating & Cooling Llc

    License
    CAC1816913
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor
  • Kenneth R Roche

    Ken Roche Plumbing Inc Dba Plumbing Now

    License
    CFC1426527
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. Apr 8, 2025

    Passed: Electrical - Temporary Service

    Inspected by Gary Pitzer

  2. Apr 8, 2025

    Release to power company

    Inspected by Gary Pitzer

  3. Apr 8, 2025

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  4. Apr 8, 2025

    Passed: Building - Footer

    2#5 On Chairs With Electric Bond

    Inspected by Gary Pitzer

  5. Apr 16, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Gary Pitzer

  6. Apr 21, 2025

    Passed: Building - Slab

    Inspected by Anthony Aslan

  7. May 21, 2025

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  8. May 21, 2025

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  9. Jun 10, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  10. Jun 10, 2025

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  11. Jun 10, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  12. Jun 11, 2025

    Passed: Building - Framing

    Inspected by Gary Pitzer

  13. Jun 11, 2025

    Cancelled: Building - Framing

    Inspected by Gary Pitzer

  14. Jun 23, 2025

    Passed: Building - Insulation

    Walls Batted, Air Baffles, Will Be Blown In Attic

    Inspected by Gary Pitzer

  15. Sep 9, 2025

    Passed: Electrical - Permanent Power

    Need Septic Final

    Inspected by Troy Crews

  16. Oct 23, 2025

    Release to power company

    Final Septic Rec'd 10/22

    Inspected by Mgarber

  17. Oct 30, 2025

    Septic Release Inspection

    Inspected by Health Dept

  18. Nov 13, 2025

    Failed: Building - Final

    Exterior Faucets Require Anti-siphon Devices, Interior Faucet In Hall Bath Pouring Water Out And Water In Cabinet Same Location, Some Detection Devices Not All Functioning Properly, Need Blower Door Test

    Inspected by Gary Pitzer

  19. Nov 14, 2025

    Passed: Building - Final

    Final Inspection Complete. Permit Under Office Review For Co Eligibility.

    Inspected by Gary Pitzer

Documents