Right-of-Way Access/Driveway
Permit
| Address |
|
| Parcel #: |
05784-004 |
| Acres: | 0.21 |
| Owner: | Taylor Dion |
| Subdivision: | |
| Zoning: | RSF/MH-2 |
| Flood Zone: | X |
| District: | 1 |
| Application #: | 70055 |
| Permit #: |
000052818 |
| Related Permit: |
|
| Submitted: | Monday, March 31, 2025 |
| Issued: | Thursday, April 3, 2025 |
| Expires: | Friday, February 27, 2026 |
| Completed: | Friday, February 27, 2026 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0305D |
| Standards |
Culvert installation shall conform to the approved site plan standards |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of connection for access road |
Verify Existing Drive |
| Type of construction of property |
Site Built Home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
1 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
Review Notes
| 3/23/2025 |
Application pending. |
| 3/31/2025 |
Application submitted by applicant. |
| 3/31/2025 |
Pending Public Works Application Approval |
| 4/1/2025 |
Application Approved by Public Works |
| 4/2/2025 |
Final Review - Payment Needed |
| 4/2/2025 |
Pending initial driveway inspection |
| 4/3/2025 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
3/31/2025 |
| Failed: Engineering - Verify existing driveway |
No Driveway At This Location. |
Beach, Garrett |
4/2/2025 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
4/3/2025 |
| Passed: Engineering - Driveway Spot Check |
Nothing Being Done At This Time |
Smith, Blake |
10/1/2025 |
| Passed: Engineering - Final Driveway |
inspection Notes: Spoke With Mr. Taylor About Removing The Concrete Debris From Culver Pipe. |
Beach, Garrett |
2/27/2026 |