Permit Details

Permit Search

Permit

Roof Replacement or Repair

153 SW BREEZY DR
LAKE CITY, FL 32025

Permit #
000052687
Application #
70040
Status Completed
  1. Submitted Mar 21, 2025
  2. Issued Mar 24, 2025
  3. Expires Oct 18, 2025
  4. Completed Apr 21, 2025

Property

Parcel #
08944-016
Owner
Perry William G Jr, Perry Karen S
Acres
5.66
Subdivision
Hillcrest Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0401C
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
41
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
35321.1
Product Manufacturer
TAMKO Asphalt Shingles
Product Description
Non-ASTM D3462 asphalt roof shingles and ridge cap shingles
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. Apr 15, 2025

    Passed: Re-Roof - In Progress

    Tear Off And Drying In

    Inspected by Anthony Aslan

  2. Apr 21, 2025

    Passed: Re-Roof - Final

    Inspected by Anthony Aslan