Permit Details

Permit Search

Permit

New Residential Construction

413 SW HIGHPOINT GLN
LAKE CITY, FL 32024

Permit #
000052680
Application #
69862
Status Completed
  1. Submitted Mar 10, 2025
  2. Issued Mar 24, 2025
  3. Expires Mar 22, 2026
  4. Completed Oct 23, 2025

Property

Parcel #
03406-125
Owner
Cady Micah J, Cady Alisha A
Acres
3.39
Subdivision
Rose Creek Plantation Phase 2
Zoning
A-3
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0383D
This is the construction of a
Accessory Structure
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
2
Heated Area (Sqft)
796
Total Area (Sqft)
1671
Building Height
25
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
accessory structure to main dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0195
If Other, explain the use of the structure.
accessory dwelling unit
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Zoning Review - Reviewed
  6. Plan Review - Documents Required
  7. Plan Review - Building Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Plumbing Approved
  11. Plan Review - Reviewed
  12. Final Review - Documents Required
  13. Final Review - Documents Required
  14. Final Review - Documents Required
  15. Final Review - Reviewed
  16. Final Review - Payment Needed
  17. Permit Issued

Contractors

  • James Zuber

    All Seasons Planning, Inc.

    License
    CGC1517099
    Title
    General Contractor
    Role
    Contractor

    County License & State License & Liability Insurance Expired.

  • Barry R Huber

    Daybreak Dba Huber & Associates

    License
    CCC050488
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Trever J Townsend

    Townsend Electrical Contractors, Llc

    License
    ER13016105
    Title
    Reg. Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Brent Mccall

    Suwannee Valley Plumbing Llc

    License
    CFC1432405
    Title
    Cert. Plumbing
    Role
    Subcontractor

Inspections

  1. Mar 28, 2025

    Septic Release Inspection

    Inspected by Health Dept

  2. Apr 1, 2025

    Passed: Engineering - Setbacks

    Appears To Be With Site Plan

    Inspected by Gary Pitzer

  3. Apr 1, 2025

    Passed: Building - Footer

    2#5 Rebar On Chairs And Wired, Electric Steel Bond In Place

    Inspected by Gary Pitzer

  4. Apr 17, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    No Cleanout, Water Under Pressure

    Inspected by Gary Pitzer

  5. Apr 22, 2025

    Passed: Building - Slab

    Steel, Plastic And Taped

    Inspected by Gary Pitzer

  6. May 13, 2025

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  7. May 13, 2025

    Failed: Building - Roof Decking

    Roof Dryer In, No Access To Second Flood Steps In Progress

    Inspected by Gary Pitzer

  8. May 14, 2025

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  9. May 15, 2025

    Passed: Building - Framing

    Inspected by Gary Pitzer

  10. May 15, 2025

    Passed: Building - Strapping

    Inspected by Gary Pitzer

  11. May 27, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  12. May 27, 2025

    Passed: Mechanical - Rough In

    Spit System ,lines And Drains

    Inspected by Gary Pitzer

  13. May 27, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    No Gas

    Inspected by Gary Pitzer

  14. May 27, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Gary Pitzer

  15. Jun 20, 2025

    Passed: Building - Insulation

    Spray Foam Walls, Batt In Floor

    Inspected by Anthony Aslan

  16. Sep 23, 2025

    Passed: Building - Final

    All Requirements Met To Release Co

    Inspected by Gary Pitzer

  17. Sep 23, 2025

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  18. Sep 23, 2025

    Release to power company

    Inspected by Gary Pitzer