| Septic Release Inspection |
|
Health Dept |
3/28/2025 |
| Passed: Engineering - Setbacks |
Appears To Be With Site Plan |
Gary Pitzer |
4/1/2025 |
| Passed: Building - Footer |
2#5 Rebar On Chairs And Wired, Electric Steel Bond In Place |
Gary Pitzer |
4/1/2025 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
No Cleanout, Water Under Pressure |
Gary Pitzer |
4/17/2025 |
| Passed: Building - Slab |
Steel, Plastic And Taped |
Gary Pitzer |
4/22/2025 |
| Passed: Building - Wall Sheathing |
|
Gary Pitzer |
5/13/2025 |
| Failed: Building - Roof Decking |
Roof Dryer In, No Access To Second Flood Steps In Progress |
Gary Pitzer |
5/13/2025 |
| Passed: Building - Roof Decking |
|
Gary Pitzer |
5/14/2025 |
| Passed: Building - Framing |
|
Gary Pitzer |
5/15/2025 |
| Passed: Building - Strapping |
|
Gary Pitzer |
5/15/2025 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
5/27/2025 |
| Passed: Mechanical - Rough In |
Spit System ,lines And Drains |
Gary Pitzer |
5/27/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
No Gas |
Gary Pitzer |
5/27/2025 |
| Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Gary Pitzer |
5/27/2025 |
| Passed: Building - Insulation |
Spray Foam Walls, Batt In Floor |
Anthony Aslan |
6/20/2025 |
| Passed: Building - Final |
All Requirements Met To Release Co |
Gary Pitzer |
9/23/2025 |
| Passed: Electrical - Permanent Power |
|
Gary Pitzer |
9/23/2025 |
| Release to power company |
|
Gary Pitzer |
9/23/2025 |