Permit Details

Permit Search

Permit

Roof Replacement or Repair

366 SW SILVER PALM DR
LAKE CITY, FL 32024

Permit #
000052595
Application #
69917
Status Completed
  1. Submitted Mar 13, 2025
  2. Issued Mar 14, 2025
  3. Expires Nov 1, 2025
  4. Completed May 5, 2025

Property

Parcel #
02731-073
Owner
Parrott Donna K, Parrott James O
Acres
0.25
Subdivision
Preserve At Laurel Lake Unit 1
Zoning
PRD
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0290D
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Tear off existing shingles and replace with GAF Architectual Shingles
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
3200
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL.10124.R31
Product Manufacturer
GAF
Product Description
Architectural shingle
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Final Review - Payment Needed
  5. Permit Issued

Contractors

  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CCC1329482
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Apr 17, 2025

    Passed: Re-Roof - In Progress

    Shingle Tear Off In Progress

    Inspected by Troy Crews

  2. May 5, 2025

    Passed: Re-Roof - Final

    Inspected by Troy Crews