Permit Details

Permit Search

Permit

New Residential Construction

1414 NW JOSEPHINE ST
LAKE CITY, FL 32055

Permit #
000052524
Application #
69015
Status Completed
  1. Submitted Jan 17, 2025
  2. Issued Mar 7, 2025
  3. Expires Aug 25, 2026
  4. Completed Mar 3, 2026

Property

Parcel #
04804-112
Owner
Lunsford Donald Lee Iii, Lunsford Haley Diane
Acres
17.82
Subdivision
Falling Creek Farms- Division Of Land
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0195D
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1605
Total Area (Sqft)
2293
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0039
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Zoning Review - Reviewed
  6. Plan Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - Plumbing Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Building Approved
  12. Plan Review - Reviewed
  13. Final Review - Documents Required
  14. Final Review - Documents Required
  15. Final Review - Documents Required
  16. Final Review - Reviewed
  17. Final Review - Payment Needed
  18. Permit Issued

Contractors

  • Ronnie Edenfield

    Scci Inc

    License
    CBC1267457
    Title
    Cert. Building
    Role
    Contractor
  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Don C Bills Sr

    Hometown Plumbing Services Llc

    License
    CFC1428890
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Ralph W Laverdure

    Rwl Roofing Llc

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Donald R Davis

    High Springs Electric Inc

    License
    CAC1815367
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Jun 17, 2025

    Passed: Building - Footer

    Put Ground Wire On Steel Prior To Pour

    Inspected by Troy Crews

  2. Jun 17, 2025

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jul 15, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  4. Jul 18, 2025

    Passed: Building - Slab

    Inspected by Anthony Aslan

  5. Aug 6, 2025

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  6. Aug 6, 2025

    Passed: Building - Wall Sheathing

    Complete Nailing Of Gable And Strapping And Send Pictures Prior To Cover Up

    Inspected by Troy Crews

  7. Aug 22, 2025

    Passed: Building - Strapping

    Inspected by Troy Crews

  8. Aug 22, 2025

    Passed: Building - Window Attachment

    Inspected by Troy Crews

  9. Sep 24, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Nail Guards Missing In Several Place cold Water Line In Contact With Kitchen Exhaust Piping check On Re-inspection Of Mechanical

    Inspected by Anthony Aslan

  10. Sep 24, 2025

    Passed: Building - Framing

    Anchors Missing In Corners

    Inspected by Anthony Aslan

  11. Sep 24, 2025

    Failed: Mechanical - Rough In

    Exhaust Pipe Over Allowable Length

    Inspected by Anthony Aslan

  12. Sep 24, 2025

    Passed: Electrical - 2nd Rough-In

    Nail Guards Missing In Several Places

    Inspected by Anthony Aslan

  13. Sep 26, 2025

    Passed: Mechanical - Rough In

    Inspected by Christian Allen

  14. Oct 3, 2025

    Passed: Building - Insulation

    Inspected by Christian Allen

  15. Dec 3, 2025

    Passed: Electrical - Permanent Power

    Need Septic And Drive Final - Ew

    Inspected by Christian Allen

  16. Dec 22, 2025

    Release to power company

    Inspected by Ewilliams

  17. Dec 22, 2025

    Septic Release Inspection

    Inspected by Health Dept

  18. Feb 25, 2026

    Cancelled: Building - Final

    Inspected by Tcrews

  19. Feb 26, 2026

    Passed: Building - Final

    All Requirements Met To Release Co-- 3.3.26 Mg

    Inspected by Christian Allen

Documents