Permit Information

New Residential Construction Permit

Address 279 SW CADENCE GLN
LAKE CITY, FL 32024
Parcel #: 03001-109
Acres:0.96
Owner:Maronda Homes Llc,
Subdivision:Forest Cove
Zoning:RSF-2
Flood Zone:X
District:3
Application #:69548
Permit #: 000052505
Related Permit:
Submitted:Wednesday, February 19, 2025
Issued:Wednesday, March 5, 2025
Expires:Wednesday, July 2, 2025
Completed:Wednesday, July 2, 2025
Status: Completed
Septic Release? Yes

Notes

*MFE = 104.3', SURVEYOR CONFIRMATION REQUIRED *AS BUILT SURVEY PRIOR TO CO PER PLAT FOR DRAINAGE SWALES AND LOT CONTOURS

Job Details

Elevation regulation Subdivision Plat
Finished floor requirement 104.3'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0289D
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 3282
Total Area (Sqft) 4382
Building Height 25
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 25-0092
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps 200

Review Notes

2/19/2025 Application pending.
2/19/2025 Application submitted by applicant.
2/19/2025 Point Review - Processing
3/4/2025 Point Review - Printed-Online Application
3/4/2025 Point Review - Reviewed
3/4/2025 Zoning Review - Reviewed
3/4/2025 Plan Review - Plumbing Approved
3/4/2025 Plan Review - Mechanical Approved
3/4/2025 Plan Review - Electrical Approved
3/4/2025 Plan Review - Building Approved
3/4/2025 Plan Review - Reviewed
3/4/2025 Final Review - Processing
3/4/2025 Final Review - Reviewed
3/4/2025 Final Review - Payment Needed
3/5/2025 Permit Issued
6/4/2025 Final Review - Complete

Contractors

Name / Business License Title Role
Adam Gaslin
Maronda Homes Llc Of Florida
CRC1331630 Cert. Residential Contractor
Ryan Hinote
Nature Coast Electrical
EC13011934 Cert. Electrical Subcontractor
Robert M Bounds
Bounds Heating & Air Inc
CAC057642 Class A A/c Subcontractor
Paul K Coleman
Colemans Plumbing Inc.
CFC1425624 Certified Plumbing Subcontractor
Benjamin T Keeler
Keeler Roofing, Llc
CCC1330509 Cert. Roofing Subcontractor

Inspections

Inspection Notes Performed By Date
Passed: Plumbing/Gas - 1st Underground Rough–In Water And Waste Matt Forsyth 3/17/2025
Rescheduled 3/24/2025:Building - Monolithic Slab Matt Forsyth 3/21/2025
Rescheduled 3/24/2025:Engineering - Setbacks Matt Forsyth 3/21/2025
Passed: Building - Monolithic Slab Bait System Will Be Used Matt Forsyth 3/24/2025
Passed: Engineering - Setbacks Matt Forsyth 3/24/2025
Passed: Electrical - Temporary Service Matt Forsyth 3/31/2025
Release to power company Matt Forsyth 3/31/2025
Rescheduled 4/4/2025:Building - Masonry Wall Reinforcing Matt Forsyth 4/3/2025
Passed: Building - Masonry Wall Reinforcing Steele Placed In Top Wall Matt Forsyth 4/4/2025
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 5/7/2025
Passed: Building - Framing Matt Forsyth 5/7/2025
Passed: Building - Roof Decking Matt Forsyth 5/7/2025
Passed: Electrical - 2nd Rough-In Matt Forsyth 5/7/2025
Passed: Mechanical - Rough In Matt Forsyth 5/7/2025
Passed: Plumbing/Gas - 2nd Rough-In Tub Water Tested Matt Forsyth 5/7/2025
Passed: Building - Insulation Matt Forsyth 5/12/2025
Passed: Electrical - Permanent Power Need Septic And Final Drive Matt Forsyth 6/4/2025
Septic Release Inspection Health Dept 6/9/2025
Release to power company Septic And Drive Rec'd Melissa Garber 6/19/2025
Passed: Building - Final As-built Approved By Chad - County Engineer 7.2.25 Mg Matt Forsyth 7/1/2025

Documents

File Name Date File Size

Contact Us

Building Department

Office Hours

Monday-Friday
8:00 A.M. - 4:30 P.M.

Contact Information

Phone: 386-758-1008
Fax: 386-758-2160

Email: bldginfo@columbiacountyfla.com

Location

135 NE Hernando Ave.
Lake City, FL 32055 (opens in new window)

Mailing Address

P.O. Box 1529
Lake City, FL 32056-1529

Public Records

Public records policy and fees

Board of County Commissioners
Tel. (386) 758-1326
Fax: (386) 758-2182
Email: publicrecords@columbiacountyfla.com

Mailing Address:
P.O. Box 1529
Lake City, FL 32056-1529

Citizen Feedback

Let us know how we're doing

ADA Accessibility

Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the Columbia County ADA Coordinator at (386) 758-3344. You may also email that office at hr@columbiacountyfla.com and provide a brief description of the inaccessible feature.

Columbia County strives to provide reasonable accommodations to help people with disabilities have an equal opportunity to participate in our public meetings. Please notify our ADA Coordinator at least 48 hours prior to the public meeting by calling (386) 758-3344.