Permit Details

Permit Search

Permit

Mobile Home

182 SE DOE GLN
LAKE CITY, FL 32025

Permit #
000052483
Application #
69479
Status Completed
  1. Submitted Feb 14, 2025
  2. Issued Mar 3, 2025
  3. Expires Dec 8, 2025
  4. Completed Jul 2, 2025

Property

Parcel #
08980-001
Owner
Fogelman Karl S, Fogelman Donna Marie
Acres
5.11
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0401C
Mobile Home is a:
Double Wide
Year Built
2025
Width (Ft.In)
24
Length (Ft.In)
50
Driveway access to home:
Existing Drive
Installation Decal #
115994
Special temporary use permit number:
STU250207
Septic #
25-0111
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
FL265000HA000114AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Zoning Review - Reviewed
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Plan Review - Reviewed
  7. Final Review - Processing
  8. Final Review - Payment Needed
  9. Permit Issued

Contractors

  • Kyle Johnson

    Florida Mfg Foundations Llc

    License
    IH1126657
    Title
    Mh (dih) Dealer/installer
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Jun 11, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    Final Septic Release Required Prior To Release Of Power And Co-- 6.19.25 Mg --rec;d 7.1.25 Mg

    Inspected by Anthony Aslan

  2. Jun 11, 2025

    Passed: Engineering - Setbacks

    Appears Within Setbacks

    Inspected by Anthony Aslan

  3. Jul 1, 2025

    Septic Release Inspection

    Inspected by Health Dept

  4. Jul 2, 2025

    Release to power company

    Inspected by Melissa Garber