Permit Details

Permit Search

Permit

Mobile Home

529 SW MILL LN
LAKE CITY, FL 32024

Permit #
000052406
Application #
69195
Status Completed
  1. Submitted Jan 28, 2025
  2. Issued Feb 21, 2025
  3. Expires Oct 8, 2025
  4. Completed Apr 23, 2025

Property

Parcel #
00414-102
Owner
Jimenez Juan Carlos, Patterson Samuel David
Acres
4.61
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0360C
Mobile Home is a:
Single Wide
Year Built
2025
Width (Ft.In)
14
Length (Ft.In)
54
Driveway access to home:
Private Driveway Permit
Installation Decal #
117157
Special temporary use permit number:
stu250103
Septic #
25-0114
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
FLTHLCT1424G-4785
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
2
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Processing
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Zoning Review - Reviewed
  7. Plan Review - Reviewed
  8. Final Review - Documents Required
  9. Zoning Review - Reviewed
  10. Final Review - Documents Required
  11. Final Review - Documents Required
  12. Final Review - Documents Required
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued

Contractors

  • John Harden

    Jh Contracting Llc

    License
    IH1150540
    Title
    Mh Installer (ih)
    Role
    Contractor

    Liability Insurance & Workers Comp Expired.

  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Apr 11, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    Septic Final Needed

    Inspected by Matt Forsyth

  2. Apr 11, 2025

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Apr 23, 2025

    Release to power company

    Inspected by Melissa Garber

  4. Apr 23, 2025

    Certificate-Release Certificate

    Inspected by Matt Forsyth

  5. Apr 23, 2025

    Septic Release Inspection

    Inspected by Health Dept