Permit Details

Permit Search

Permit

Mobile Home

202 NE COLVIN AVE
LAKE CITY, FL 32055

Permit #
000052361
Application #
69393
Status Completed
  1. Submitted Feb 10, 2025
  2. Issued Feb 18, 2025
  3. Expires Sep 21, 2025
  4. Completed Mar 25, 2025

Property

Parcel #
04967-034
Owner
Olisa Properties, Llc,
Acres
1.02
Subdivision
Five Points Acres
Zoning
RSF/MH-2
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0285D
Mobile Home is a:
Single Wide
Year Built
2025
Width (Ft.In)
16
Length (Ft.In)
56
Driveway access to home:
Existing Drive
Installation Decal #
119093
Septic #
25-0136
Setbacks Front
25'
Setback Side 1
10'
Setbacks Rear
15'
Dev Permit #
F023-
Setback Side 2
10'
Are you applying for a 5 year temporary permit?
No
Serial #
40647
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
2
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Plan Review - Reviewed
  5. Point Review - Printed-Online Application
  6. Point Review - Reviewed
  7. Zoning Review - Reviewed
  8. Final Review - Documents Required
  9. Final Review - Payment Needed
  10. Permit Issued

Contractors

  • Rusty L Knowles

    Floridas Finest Mobile Home Set Up

    License
    IH1038219
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Mar 25, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Release (rec'd)

    Inspected by Anthony Aslan

  2. Mar 25, 2025

    Passed: Engineering - Setbacks

    Appears Within Setbacks

    Inspected by Anthony Aslan

  3. Mar 25, 2025

    Septic Release Inspection

    Inspected by Health Dept

  4. Apr 4, 2025

    Release to power company

    Inspected by Anthony Aslan

  5. Apr 4, 2025

    Submitted Power Release through FPL Portal

    Inspected by Ward, Emaleigh C.