Permit Details

Permit Search

Permit

New Residential Construction

1240 SW RIDGE ST
LAKE CITY, FL 32024

Permit #
000052245
Application #
68906
Status Completed
  1. Submitted Jan 9, 2025
  2. Issued Feb 4, 2025
  3. Expires Apr 26, 2026
  4. Completed Oct 28, 2025

Property

Parcel #
03155-102
Owner
Revis Marty H, Revis Jamie T
Acres
6.76
Subdivision
Oak Ridge Estates Unit Iii
Zoning
A-3
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0381D
This is the construction of a
Single Family Dwelling
Stories
1
Heated Area (Sqft)
2185
Total Area (Sqft)
3101
Building Height
19.7
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0920
If Other, explain the use of the structure.
Home was destroyed due to hurricane fire. Home is being rebuilt on existing concrete slab.
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Processing
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Zoning Review - Documents Required
  7. Zoning Review - Reviewed
  8. Plan Review - Documents Required
  9. Plan Review - Documents Required
  10. Plan Review - Documents Required
  11. Plan Review - Documents Required
  12. Plan Review - Plumbing Approved
  13. Plan Review - Mechanical Approved
  14. Plan Review - Electrical Approved
  15. Plan Review - Building Approved
  16. Plan Review - Reviewed
  17. Final Review - Documents Required
  18. Final Review - Corrections Needed
  19. Final Review - Corrections Needed
  20. Permit Issued
  21. Point Review - Reviewed

Contractors

  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CGC1516042
    Title
    General Contractor
    Role
    Contractor
  • Roger Whiddon

    Lake City Plumbing Inc

    License
    CFC1428686
    Title
    Cert Plumbing
    Role
    Subcontractor
  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CCC1329482
    Title
    Roofing Contractor
    Role
    Subcontractor
  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Jan 10, 2025

    Septic Release Inspection

    Inspected by Health Dept

  2. Feb 12, 2025

    Passed: Engineering - Setbacks

    Appears To Within Limits,no Markers

    Inspected by Gary Pitzer

  3. Feb 12, 2025

    Passed: Building - Footer

    New Bumpout Area, 2#5 On Shairs And Wired

    Inspected by Gary Pitzer

  4. Feb 24, 2025

    Passed: Building - Slab

    3 New Slabs With #5 Rebar For Turn Downs And Perimeter Wired, Plastic Taped

    Inspected by Gary Pitzer

  5. May 2, 2025

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  6. May 2, 2025

    Failed: Building - Strapping

    Work In Progress

    Inspected by Gary Pitzer

  7. May 2, 2025

    Failed: Building - Wall Sheathing

    3 Gables To Complete

    Inspected by Gary Pitzer

  8. May 2, 2025

    Failed: Building - Ext Strapping/Wall Sheathing

    In Progress, Several To Finish

    Inspected by Gary Pitzer

  9. May 7, 2025

    Failed: Building - Ext Strapping/Wall Sheathing

    Shearing Complete, Strapping Still In Progress

    Inspected by Gary Pitzer

  10. May 21, 2025

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  11. May 21, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  12. May 21, 2025

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  13. May 21, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Gary Pitzer

  14. May 21, 2025

    Passed: Building - Strapping

    Inspected by Gary Pitzer

  15. May 21, 2025

    Rescheduled 5/22/2025:Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  16. May 21, 2025

    Rescheduled 5/22/2025:Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Gary Pitzer

  17. May 22, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Tu. Flooded

    Inspected by Gary Pitzer

  18. May 22, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    +110 Psi On Water

    Inspected by Gary Pitzer

  19. Jun 2, 2025

    Passed: Building - Insulation

    Foam, Walls And Roof

    Inspected by Gary Pitzer

  20. Aug 13, 2025

    Passed: Electrical - Permanent Power

    Cannot Release Power Until Driveway Permit Has Final Inspection.

    Inspected by Anthony Aslan

  21. Aug 18, 2025

    Release to power company

    Drive Complete

    Inspected by Tcrews

  22. Oct 28, 2025

    Passed: Building - Final

    Inspected by Gary Pitzer

Documents