Permit Details

Permit Search

Permit

Roof Replacement or Repair

942 SW MOUNT CARMEL AVE
LAKE CITY, FL 32024

Permit #
000052198
Application #
69106
Status Completed
  1. Submitted Jan 23, 2025
  2. Issued Jan 30, 2025
  3. Expires Oct 26, 2025
  4. Completed Apr 29, 2025

Property

Parcel #
02820-009
Owner
Stalvey Allen M, Stalvey Abiligail
Acres
11.43
Subdivision
—
Zoning
RR
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0290D
Type Roofing Job
Overlay with Metal
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
metal over shingles
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
4944
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
Placing metal over Shingles
Type of New Roofing Product
Metal
Florida Product Approval Number
4595.17
Product Manufacturer
Captial Metal
Product Description
metal
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Off-ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Final Review - Payment Needed
  5. Permit Issued

Contractors

  • Harry D Anderson Jr

    Southeastern Coatings & Waterproofing, Inc.

    License
    CCC1326114
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Mar 11, 2025

    Rescheduled 3/11/2025:Re-Roof - In Progress

    Inspected by Troy Crews

  2. Mar 11, 2025

    Passed: Re-Roof - In Progress

    Metal Over Purlins

    Inspected by Anthony Aslan

  3. Apr 29, 2025

    Passed: Re-Roof - Final

    Inspected by Anthony Aslan