Permit Details

Permit Search

Permit

New Residential Construction

288 SW KIMBERLY LN
LAKE CITY, FL 32024

Permit #
000052132
Application #
67904
Status Completed
  1. Submitted Nov 1, 2024
  2. Issued Jan 24, 2025
  3. Expires Apr 26, 2026
  4. Completed Oct 29, 2025

Property

Parcel #
03026-108
Owner
Wayne Terry L,
Acres
1.01
Subdivision
Kimberly Oaks
Zoning
RR
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
98' NA
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0289D
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Heated Area (Sqft)
1854
Total Area (Sqft)
2530
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0589
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Plan Review - Documents Required
  5. Zoning Review - Reviewed
  6. Plan Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - On Hold-Incomplete
  9. Point Review - Printed-Online Application
  10. Plan Review - Building Approved
  11. Plan Review - Electrical Approved
  12. Plan Review - Mechanical Approved
  13. Plan Review - Plumbing Approved
  14. Plan Review - Fuel/Gas Approved
  15. Plan Review - Reviewed
  16. Final Review - Reviewed
  17. Final Review - Payment Needed
  18. Final Review - Payment Needed
  19. Final Review - Payment Needed
  20. Final Review - Payment Needed
  21. Final Review - Payment Needed
  22. Final Review - Payment Needed
  23. Final Review - Payment Needed
  24. Final Review - Payment Needed
  25. Final Review - Payment Needed
  26. Final Review - Payment Needed
  27. Final Review - Payment Needed
  28. Final Review - Payment Needed
  29. Final Review - Payment Needed
  30. Permit Issued
  31. Zoning Review - Reviewed

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Feb 17, 2025

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Feb 17, 2025

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Feb 17, 2025

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  4. Feb 17, 2025

    Release to power company

    Inspected by Matt Forsyth

  5. Apr 7, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  6. Apr 16, 2025

    Passed: Building - Slab

    Nice Work

    Inspected by Matt Forsyth

  7. Jun 16, 2025

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  8. Jun 16, 2025

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  9. Jun 18, 2025

    Passed: Building - Framing

    Very Nice

    Inspected by Matt Forsyth

  10. Jul 10, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  11. Jul 10, 2025

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  12. Jul 10, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  13. Jul 17, 2025

    Passed: Building - Insulation

    Walls Only

    Inspected by Matt Forsyth

  14. Sep 8, 2025

    Passed: Electrical - Permanent Power

    Need Drive Final And Septic Final

    Inspected by Troy Crews

  15. Sep 24, 2025

    Cancelled: Engineering - D.O.T Final Driveway

    Not A Fdot Sr

    Inspected by Brad Long

  16. Sep 25, 2025

    Septic Release Inspection

    Inspected by Health Dept

  17. Sep 29, 2025

    Release to power company

    Rec'd Septic - Final Drive Not In However It Was An Oversight On Our Part There Was No Driveway Permit Started Until 9/29 No Co To Be Issued Until Final Drive Is Rec'd

    Inspected by Ewilliams

  18. Oct 28, 2025

    Passed: Building - Final

    All Requirments Met To Release Co

    Inspected by Matt Forsyth

Documents