Permit Details

Permit Search

Permit

Roof Replacement or Repair

124 SW ORCHARD CT
LAKE CITY, FL 32024

Permit #
000052120
Application #
69044
Status Completed
  1. Submitted Jan 20, 2025
  2. Issued Jan 21, 2025
  3. Expires Oct 11, 2025
  4. Completed Apr 14, 2025

Property

Parcel #
00331-006
Owner
Striebel Rebecca D, Striebel Jeremy D
Acres
5.00
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0270C
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
38
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Metal
Florida Product Approval Number
20147.1 R3
Product Manufacturer
CAPITAL METAL SUPPLY
Product Description
26 Ga. Capital PBR Roof Panel over open framing
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Status Cleared
  4. Final Review - Payment Needed
  5. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. Apr 11, 2025

    Passed: Re-Roof - In Progress

    Inspected by Matt Forsyth

  2. Apr 14, 2025

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth