Permit Details

Permit Search

Permit

New Residential Construction

377 SE DEERWOOD GLN
LAKE CITY, FL 32025

Permit #
000052004
Application #
64738
Status Completed
  1. Submitted Mar 29, 2024
  2. Issued Feb 26, 2026
  3. Expires Mar 15, 2027
  4. Completed Sep 21, 2026

Property

Parcel #
08302-117
Owner
Martin Leofus A,
Acres
1.03
Subdivision
Deerwood Forest Unit 2
Zoning
RSF-2
Flood zone
AH
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
104.5' One foot above FEMA Map Elevation
Requirement needed
By Final Inspection
Document needed is
Elevation Certificate
Document receieved
Yes
Fema map number
12023C0313D
Water source
Sante Fe
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1466
Total Area (Sqft)
2075
Building Height
16
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0464
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Point Review - On Hold-Incomplete
  5. Point Review - On Hold-Incomplete
  6. Point Review - On Hold-Incomplete
  7. Point Review - On Hold-Incomplete
  8. Point Review - Printed-Online Application
  9. Zoning Review - Documents Required
  10. Zoning Review - Documents Required
  11. Zoning Review - Documents Required
  12. Zoning Review - Documents Required
  13. Zoning Review - Documents Required
  14. Point Review - Printed-Online Application
  15. Zoning Review - Documents Required
  16. Zoning Review - Documents Required
  17. Zoning Review - Documents Required
  18. Zoning Review - Documents Required
  19. Zoning Review - Reviewed
  20. Zoning Review - Reviewed
  21. Plan Review - Documents Required
  22. Plan Review - Plumbing Approved
  23. Plan Review - Mechanical Approved
  24. Plan Review - Electrical Approved
  25. Plan Review - Building Approved
  26. Plan Review - Reviewed
  27. Final Review - Processing
  28. Final Review - Reviewed
  29. Final Review - Payment Needed
  30. Permit Issued
  31. Zoning Review - Documents Required
  32. Zoning Review - Email Sent
  33. Zoning Review - Reviewed
  34. Permit Status Update Notification
  35. Permit Status Update Notification
  36. Permit Renewed
  37. Permit Renewed
  38. Permit Status Update Notification
  39. Permit Status Update Notification
  40. Permit Status Update Notification

Contractors

  • Don C Bills Sr

    Hometown Plumbing Services Llc

    License
    CFC1428890
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Ralph W Laverdure

    Rwl Roofing Llc

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Stephen M Brisbois

    Epic Ac Service (dba) Central Home Heating & Air Llc

    License
    CAC1819412
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor
  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ronnie Edenfield

    Scci Inc

    License
    CBC1267457
    Title
    Cert. Building
    Role
    Contractor

Inspections

  1. Jan 23, 2025

    Passed: Building - Footer

    Compaction Test Required Prior To Slab Being Poured

    Inspected by Anthony Aslan

  2. Jan 23, 2025

    Passed: Engineering - Setbacks

    Appears Within Setbacks

    Inspected by Anthony Aslan

  3. Jan 23, 2025

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  4. Jan 23, 2025

    Release to power company

    Inspected by Anthony Aslan

  5. Feb 24, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  6. Mar 7, 2025

    Passed: Building - Slab

    Compaction Test Rec'd

    Inspected by Anthony Aslan

  7. Mar 27, 2025

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  8. Mar 27, 2025

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  9. May 6, 2025

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  10. May 6, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  11. May 6, 2025

    Passed: Building - Framing

    Inspected by Anthony Aslan

  12. May 6, 2025

    Passed: Electrical - 1st Underground Rough–In

    Exhaust Fans Wire Not Connected

    Inspected by Anthony Aslan

  13. May 6, 2025

    Failed: Mechanical - Rough In

    Ducts Over And In Attic Access

    Inspected by Anthony Aslan

  14. May 19, 2025

    Cancelled: Building - Strapping

    Inspected by Anthony Aslan

  15. May 19, 2025

    Passed: Electrical - 2nd Rough-In

    Corrections Made

    Inspected by Anthony Aslan

  16. May 19, 2025

    Passed: Mechanical - Rough In

    Corrections Made

    Inspected by Anthony Aslan

  17. May 19, 2025

    Passed: Building - Insulation

    Walls Only

    Inspected by Anthony Aslan

  18. Jan 12, 2026

    Septic Release Inspection

    Inspected by Health Dept

  19. Jul 10, 2026

    Cancelled: Electrical - Permanent Power

    Inspected by Nanderson

  20. Aug 5, 2026

    Passed: Planning and Zoning Review - Elevation Confirmation

    Final Ec Received And Ok For Co

    Inspected by Karen Aiken-smoot

  21. Aug 6, 2026

    Passed: Electrical - Permanent Power

    Cannot Release Power Until Driveway Permit Has Final Inspection.

    Inspected by Christian Allen

  22. Aug 13, 2026

    Passed: City of Lake City Utilities - Lake City Utilities Tap Inspection

    Inspected by City Of Lake City Distribution And Collections Department

  23. Aug 17, 2026

    Release to power company

    Rec'd City Tap And Final Drive

    Inspected by Ewilliams

  24. Sep 16, 2026

    Passed: Building - Final

    *final Termite Required Prior To Release Of Co-- 9.16.26 Mg

    Inspected by Christian Allen

  25. Requested

    Planning and Zoning Review - Elevation Confirmation

    Awaiting inspection

Documents