Permit Details

Permit Search

Permit

Roof Replacement or Repair

242 NW ZACK DR
LAKE CITY, FL 32055

Permit #
000051946
Application #
68792
Status Completed
  1. Submitted Dec 30, 2024
  2. Issued Dec 31, 2024
  3. Expires Jul 30, 2025
  4. Completed Jan 31, 2025

Property

Parcel #
02372-261
Owner
Cruz Felix Jorge
Acres
0.53
Subdivision
Emerald Lakes Phase 2
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0280D
Type Roofing Job
Re-Cover - New Material over Existing
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Put 26 G metal over existing shingles on 1x4 purlins on single family residence.
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2480
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Type of New Roofing Product
Metal
Florida Product Approval Number
FL30343.08-R3
Product Manufacturer
Premier Metal Roof MFG.
Product Description
Exposed fastener, rib style panel. Panel coverage is nominally 36” with nominal rib height of 3/4”
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Derek King

    True Force Roofing

    License
    CCC1335679
    Title
    Cert. Roofing
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Jan 21, 2025

    Passed: Re-Roof - In Progress

    Inspected by Matt Forsyth

  2. Jan 31, 2025

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth