Permit Details

Permit Search

Permit

Roof Replacement or Repair

987 SE COUNTY ROAD 245
LAKE CITY, FL 32025

Permit #
000051901
Application #
68724
Status Completed
  1. Submitted Dec 20, 2024
  2. Issued Dec 20, 2024
  3. Expires Aug 30, 2025
  4. Completed Mar 3, 2025

Property

Parcel #
07478-000
Owner
Hilliard Gary Ross, Hilliard Christy C
Acres
0.99
Subdivision
—
Zoning
RR
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0315C
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
4500
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
Fl-10124-R16
Product Manufacturer
Gaf
Product Description
30 Year Architectural Shingle
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Final Review - Payment Needed
  5. Permit Issued

Contractors

No contractors are listed on this permit.

Inspections

  1. Jan 9, 2025

    Passed: Re-Roof - In Progress

    Tear Off

    Inspected by Anthony Aslan

  2. Feb 25, 2025

    Failed: Re-Roof - Final

    Not Enough In Progress Pictures

    Inspected by Anthony Aslan

  3. Mar 3, 2025

    Passed: Re-Roof - Final

    Inspected by Troy Crews