Permit Details

Permit Search

Permit

Roof Replacement or Repair

479 SW DEKLE RD
LAKE CITY, FL 32024

Permit #
000051870
Application #
68669
Status Completed
  1. Submitted Dec 17, 2024
  2. Issued Dec 17, 2024
  3. Expires Sep 13, 2025
  4. Completed Mar 17, 2025

Property

Parcel #
02804-001
Owner
Ring Ian Wesley, Ring Andrea J
Acres
5.00
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0270C
Type Roofing Job
Re-Cover - New Material over Existing
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Metal over existing shingles
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
3900
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
Metal roof over existing shingles, installing pine 1x4 lathing every 2ft on center
Type of New Roofing Product
Metal
Florida Product Approval Number
FL36904.2
Product Manufacturer
Tri-County Metals
Product Description
26 Gauge Ultra Rib Metal
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
Other (explain)
Sealed roof decking explanation for other option.
N/A---existing shingle roof.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Second Roof Pitch (if applicable)
2:12 to 4:12
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Mar 5, 2025

    Rescheduled 3/6/2025:Re-Roof - In Progress

    Inspected by Matt Forsyth

  2. Mar 6, 2025

    Passed: Re-Roof - In Progress

    Request Ventilation Pictures And Affidavit For Final Inspection

    Inspected by Matt Forsyth

  3. Mar 17, 2025

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth