Permit Information

New Residential Construction Permit

Address 351 SW CREWS FARM TER
LAKE CITY, FL 32025
Parcel #: 08877-001
Acres:7.01
Owner:Camiel Timothy L, Camiel Sequeta J
Subdivision:
Zoning:RSF-1
Flood Zone:X
District:5
Application #:68223
Permit #: 000051855
Related Permit:
Submitted:Tuesday, November 19, 2024
Issued:Thursday, January 8, 2026
Expires:Friday, February 6, 2026
Completed:Friday, February 6, 2026
Status: Completed
Septic Release? Yes

Notes

ZONING: *MFE= 1' ABOVE THE ROAD.
LAKE CITY UTLITY CUSTOMER SERVICE NOTES The City of Lake City does not provide utilities to this location.

Job Details

Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0382D
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 3355
Total Area (Sqft) 5107
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 24-0845
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.

Review Notes

11/19/2024 City of Lake City Utilities Notified.
11/19/2024 Point Review - Received-Hard Copy Application
11/19/2024 Zoning Review - Corrections Needed
11/22/2024 Zoning Review - Corrections Needed
11/26/2024 Point Review - Reviewed
11/27/2024 Zoning Review - Reviewed
12/2/2024 Plan Review - Documents Required
12/2/2024 Plan Review - Building Approved
12/2/2024 Plan Review - Electrical Approved
12/2/2024 Plan Review - Mechanical Approved
12/2/2024 Plan Review - Plumbing Approved
12/2/2024 Plan Review - Fuel/Gas Approved
12/2/2024 Plan Review - Reviewed
12/9/2024 Final Review - Documents Required
12/11/2024 Final Review - Payment Needed
12/17/2024 Final Review - Payment Needed
12/17/2024 Permit Issued
5/14/2025 Permit Reissued
1/8/2026 Permit Renewed

Contractors

Name / Business License Title Role
Anthony George,jr.
George Construction Llc
Workers Comp Expired.
CGC016583 General Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Robert Lynch
Third Day Electric Llc
EC13001947 Cert. Electrical Subcontractor
Lonnie T Bucchi
Ace Heat & Air Inc
CAC1817024 Cert Ac Class A Subcontractor

Inspections

Inspection Notes Performed By Date
Passed: Plumbing/Gas - 1st Underground Rough–In Dwv Only, No Clean Out Gary Pitzer 2/17/2025
Cancelled: Building - Slab Melissa Garber 2/24/2025
Passed: Building - Slab Plastic And Taped, Electric Conduits For Future Use And Floor Outlets Gary Pitzer 2/25/2025
Passed: Engineering - Setbacks In Large Field Gary Pitzer 2/25/2025
Passed: Building - Footer 2#5 Rebar On Chairs, Please Post Address At First Gate Gary Pitzer 2/25/2025
Cancelled: Re-Roof - In Progress Gary Pitzer 4/15/2025
Passed: Building - Roof Decking Gary Pitzer 4/15/2025
Passed: Building - Wall Sheathing Gary Pitzer 4/15/2025
Passed: Electrical - Temporary Service 60 Amp Temp. Service With Well Power And 1 Gfci Outlet Gary Pitzer 4/25/2025
Release to power company Gary Pitzer 4/25/2025
Failed: Plumbing/Gas - 2nd Rough-In 1. Proper Protection Plates For Flex Gas Line, 2. Air Test On Gas Line, 3. Seal Around Water Line Where The Line Enters In Foundation Gary Pitzer 5/14/2025
Failed: Electrical - 2nd Rough-In Exhaust Fans Not Wired Gary Pitzer 5/14/2025
Passed: Electrical - 2nd Rough-In Gary Pitzer 5/21/2025
Passed: Plumbing/Gas - 2nd Rough-In Check Pipe Entry Next Inspection Gary Pitzer 5/21/2025
Passed: Building - Insulation Walls R-13 Batt, Attic Spray Foam Anthony Aslan 7/30/2025
Passed: Building - Spot Check Permanent Power Coming Soon Troy Crews 1/14/2026
Passed: Electrical - Permanent Power Need Final Septic Troy Crews 1/30/2026
Release to power company Troy Crews 1/30/2026
Septic Release Inspection Health Dept 2/5/2026
Passed: Building - Final Need Blower Door Test For Release Any Gas Appliances Should Be Started Up By Gas Supplier Troy Crews 2/6/2026
Passed: Certificate - Release Certificate Blower Door Recieved Crews, Malcolm T. 2/6/2026

Documents

File Name Date File Size

Contact Us

Building Department

Office Hours

Monday-Friday
8:00 A.M. - 4:30 P.M.

Contact Information

Phone: 386-758-1008
Fax: 386-758-2160

Email: bldginfo@columbiacountyfla.com

Location

135 NE Hernando Ave.
Lake City, FL 32055 (opens in new window)

Mailing Address

P.O. Box 1529
Lake City, FL 32056-1529

Public Records

Public records policy and fees

Board of County Commissioners
Tel. (386) 758-1326
Fax: (386) 758-2182
Email: publicrecords@columbiacountyfla.com

Mailing Address:
P.O. Box 1529
Lake City, FL 32056-1529

Citizen Feedback

Let us know how we're doing

ADA Accessibility

Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the Columbia County ADA Coordinator at (386) 758-3344. You may also email that office at hr@columbiacountyfla.com and provide a brief description of the inaccessible feature.

Columbia County strives to provide reasonable accommodations to help people with disabilities have an equal opportunity to participate in our public meetings. Please notify our ADA Coordinator at least 48 hours prior to the public meeting by calling (386) 758-3344.