Permit Details

Permit Search

Permit

New Residential Construction

829 SE RACETRACK LN
LAKE CITY, FL 32025

Permit #
000051849
Application #
67553
Status Completed
  1. Submitted Oct 16, 2024
  2. Issued Dec 16, 2024
  3. Expires Feb 22, 2026
  4. Completed Aug 27, 2025

Property

Parcel #
08631-007
Owner
Barber Thomas A, Barber Kelsey S
Acres
9.97
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0313D
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2466
Total Area (Sqft)
3828
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0535
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Point Review - Printed-Online Application
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Plumbing Approved
  9. Plan Review - Fuel/Gas Approved
  10. Plan Review - Reviewed
  11. Zoning Review - Reviewed
  12. Final Review - Documents Required
  13. Final Review - Documents Required
  14. Final Review - Payment Needed
  15. Final Review - Payment Needed
  16. Final Review - Payment Needed
  17. Final Review - Payment Needed
  18. Permit Issued
  19. Final Review - Complete

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Dec 23, 2024

    Passed: Building - Footer

    Inspected by Gary Pitzer

  2. Dec 23, 2024

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  3. Dec 23, 2024

    Passed: Electrical - Footer Steel & Grounding

    Footer Bonding

    Inspected by Gary Pitzer

  4. Feb 12, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Dwv, No Wager Lines,no C,ean Out

    Inspected by Gary Pitzer

  5. Feb 13, 2025

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  6. Feb 13, 2025

    Release to power company

    Inspected by Anthony Aslan

  7. Feb 27, 2025

    Passed: Building - Slab

    Inspected by Anthony Aslan

  8. Apr 24, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  9. Apr 24, 2025

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  10. Apr 24, 2025

    Cancelled: Building - Strapping

    Inspected by Anthony Aslan

  11. Apr 24, 2025

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  12. Apr 24, 2025

    Passed: Building - Framing

    Inspected by Anthony Aslan

  13. May 9, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  14. May 9, 2025

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  15. May 9, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  16. May 13, 2025

    Passed: Building - Insulation

    Batt In Walls, Spray Foam Attic

    Inspected by Anthony Aslan

  17. Jun 26, 2025

    Passed: Electrical - Permanent Power

    Need Septic Release Rcv'd

    Inspected by Anthony Aslan

  18. Jul 21, 2025

    Release to power company

    Septic Release Rec'd 7.21.25

    Inspected by Mgarber

  19. Jul 30, 2025

    Septic Release Inspection

    Inspected by Health Dept

  20. Aug 25, 2025

    Passed: City of Lake City Utilities - Lake City Utilities Tap Inspection

    Inspected by Lake City Natural Gas Department

  21. Aug 26, 2025

    Passed: Building - Final

    All Requirements Met To Release Co-- 8.27.25 Mg

    Inspected by Anthony Aslan

Documents