Permit Details

Permit Search

Permit

New Residential Construction

992 SW BOBCAT DR
FORT WHITE, FL 32038

Permit #
000051835
Application #
67929
Status Permit Issued
  1. Submitted Nov 22, 2024
  2. Issued Dec 16, 2024
  3. Expires May 8, 2027
  4. Completed —

Property

Parcel #
10024-097
Owner
Nancy Blaisdell-berthold
Acres
3.68
Subdivision
Sassafras Acres
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Permit Issued
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
12" above existing ground for entire perimeter
Fema map number
12023C0532C
This is the construction of a
Single Family Dwelling
Stories
1
Heated Area (Sqft)
1512
Total Area (Sqft)
1512
Building Height
24
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0812
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Reviewed
  4. Point Review - Printed-Online Application
  5. Zoning Review - Documents Required
  6. Zoning Review - Documents Required
  7. Zoning Review - Documents Required
  8. Plan Review - Plumbing Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Building Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Documents Required
  14. Zoning Review - Reviewed
  15. Final Review - Payment Needed
  16. Permit Issued

Contractors

This is an owner-builder project.

  1. Apr 30, 2025

    Passed: Building - Footer

    Need Porta Potty

    Inspected by Anthony Aslan

  2. Apr 30, 2025

    Passed: Engineering - Setbacks

    Appears Within Setbacks

    Inspected by Anthony Aslan

  3. Jun 9, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Need Pressure On Water Supply Lines

    Inspected by Anthony Aslan

  4. Jun 26, 2025

    Passed: Building - Slab

    Inspected by Anthony Aslan

  5. Nov 13, 2025

    Passed: Building - Roof Decking

    Inspected by Christian Allen

  6. Nov 13, 2025

    Passed: Building - Wall Sheathing

    Inspected by Christian Allen

  7. Feb 17, 2026

    Passed: Building - Window Attachment

    Inspected by Christian Allen

  8. Mar 2, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Christian Allen

  9. Mar 2, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Christian Allen

  10. Mar 2, 2026

    Passed: Building - Framing

    Inspected by Christian Allen

  11. Mar 2, 2026

    Passed: Mechanical - Rough In

    Inspected by Christian Allen

  12. Mar 13, 2026

    Passed: Building - Insulation

    Inspected by Christian Allen

  13. Mar 16, 2026

    Septic Release Inspection

    Inspected by Health Dept

  14. Sep 4, 2026

    Passed: Building - Spot Check

    Inspected by Christian Allen

  15. Nov 9, 2026

    Passed: Electrical - Permanent Power

    Cannot Release Power Until Driveway Permit Has Final Inspection.

    Inspected by Christian Allen