Permit Details

Permit Search

Permit

Right-of-Way Access/Driveway

387 NW LAMAR PL
LAKE CITY, FL 32055

Permit #
000051686
Application #
68022
Status Completed
  1. Submitted Nov 7, 2024
  2. Issued Dec 3, 2024
  3. Expires Dec 26, 2027
  4. Completed Dec 26, 2024

Property

Parcel #
02240-009
Owner
Wilkerson Jeremy Allen,
Acres
1.95
Subdivision
—
Zoning
A-3
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
Mobile Home: 000051444

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
32" above adjacent ground for entire perimeter
Fema map number
12023C0280D
Building Permit #
000051444
Standards
Culvert installation shall conform to the approved site plan standards
Requirements
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status
Permanent
Type of connection for access road
Rural Driveway
Type of construction of property
Mobile Home
Normal vehicle usage:
Automobiles
Side Drain required
Yes
Side Drain Size (diameter in inches)
18
Study Required
No
Estimated Number of Vehicle trips per day
4
Is the access for commercial or residential use?
Residential
County Road Type
Paved

Status & Review History

  1. Application submitted by applicant.
  2. Pending Public Works Application Approval
  3. Application Approved by Public Works
  4. Final Review - Payment Needed
  5. Pending initial driveway inspection
  6. Permit Issued

Contractors

  • Brent M Strickland

    License
    IH1104218
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Nov 7, 2024

    Passed: Engineering - ROW Access/Driveway connects to county maintained road

    Inspected by Chad Williams

  2. Nov 27, 2024

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  3. Dec 26, 2024

    Passed: Engineering - Final Driveway

    Inspected by Beach, Garrett