Permit Details

Permit Search

Permit

Mobile Home

220 SE COLEMAN LN
HIGH SPRINGS, FL 32643

Permit #
000051613
Application #
67930
Status Completed
  1. Submitted Nov 4, 2024
  2. Issued Nov 25, 2024
  3. Expires Aug 27, 2025
  4. Completed Mar 13, 2025

Property

Parcel #
09997-002
Owner
Coleman Dale,
Acres
1.99
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0513C
Mobile Home is a:
Double Wide
Year Built
2024
Width (Ft.In)
32
Length (Ft.In)
60
Driveway access to home:
Private Driveway Permit
Installation Decal #
108086
Septic #
24-0836
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
052-000-H-A522463AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - On Hold-Incomplete
  4. Point Review - Printed-Online Application
  5. Zoning Review - Reviewed
  6. Plan Review - Reviewed
  7. Final Review - Documents Required
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued

Contractors

  • Kyle Johnson

    Florida Mfg Foundations Llc

    License
    IH1126657
    Title
    Mh (dih) Dealer/installer
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Feb 28, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Release

    Inspected by Anthony Aslan

  2. Feb 28, 2025

    Passed: Engineering - Setbacks

    Appears Within Setbacks

    Inspected by Anthony Aslan

  3. Mar 13, 2025

    Release to power company

    Rec'd Septic

    Inspected by Emaleigh Williams

  4. Mar 13, 2025

    Certificate-Release Certificate

    Rec'd Septic

    Inspected by Anthony Aslan

  5. Mar 13, 2025

    Septic Release Inspection

    Inspected by Health Dept