Permit Details

Permit Search

Permit

Additions

135 SW STONERIDGE DR
LAKE CITY, FL 32024

Permit #
000051459
Application #
67578
Status Completed
  1. Submitted Oct 16, 2024
  2. Issued Nov 8, 2024
  3. Expires Feb 11, 2026
  4. Completed Aug 15, 2025

Property

Parcel #
03406-101
Owner
Tepedino Miguel J, Tededino Kelly
Acres
5.14
Subdivision
Rose Creek Plantation Phase 1
Zoning
A-3
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Meet existing structure
Fema map number
12023C0383D
Description of addition:
Closet
Select driveway access to property:
Existing Drive
Fire sprinklers?
No
Stories
0
Heated Area (Sqft)
520
Total Area (Sqft)
520
Total Estimated Cost
40000
Building Height
12
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Dev Permit #
F023-
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic#
24-0815
Is this an addition for commercial or residential use?
Residential
Sealed roof decking options. (Must select one.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
20

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Plan Review - Reviewed
  5. Final Review - Payment Needed
  6. Permit Issued

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor

Inspections

  1. Nov 14, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. Nov 25, 2024

    Passed: Building - Footer

    Inspected by Anthony Aslan

  3. Nov 25, 2024

    Passed: Engineering - Setbacks

    Existing House

    Inspected by Anthony Aslan

  4. Dec 11, 2024

    Passed: Building - Slab

    Plastic Taped, Rebar And Wire In Slab, All Tie Wired

    Inspected by Gary Pitzer

  5. Feb 3, 2025

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  6. Feb 3, 2025

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  7. Apr 11, 2025

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  8. Apr 11, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  9. Apr 11, 2025

    Passed: Building - Framing

    Inspected by Gary Pitzer

  10. Apr 24, 2025

    Passed: Building - Insulation

    Foam Roof, Batts In Wall Cavity

    Inspected by Gary Pitzer

  11. Aug 15, 2025

    Passed: Building - Final

    All Requirements Met For Co-- 8.15.25 Mg

    Inspected by Anthony Aslan