Permit Details

Permit Search

Permit

Mobile Home

377 SE DOWNING DR
HIGH SPRINGS, FL 32643

Permit #
000051436
Application #
67405
Status Completed
  1. Submitted Oct 8, 2024
  2. Issued Mar 17, 2025
  3. Expires Oct 13, 2025
  4. Completed May 14, 2025

Property

Parcel #
09977-002
Owner
Rodriguez Jose, Rodriguez Arisai Q
Acres
5.00
Subdivision
Downing Acres Unr
Zoning
A-3
Flood zone
0.2 PCT ANNUAL CHANCE FLOOD HAZARD
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0513C
Mobile Home is a:
Single Wide
Year Built
2022
Width (Ft.In)
14
Length (Ft.In)
68
Driveway access to home:
Private Driveway Permit
Installation Decal #
116116
Septic #
24-0653
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
023-000-H-A007608A
Wind Zone?
3
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Reviewed
  7. Final Review - Payment Needed
  8. Permit Issued
  9. Permit Reissued
  10. Permit Reissued

Contractors

  • Jacob Trowell

    Trowell's Mobile Home Set Up Llc

    License
    IH1148380
    Title
    Mh Installer (ih)
    Role
    Contractor

Inspections

  1. Oct 28, 2024

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Anthony Aslan

  2. Apr 16, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    One Set Of Steps In Place-- Septic Final (rec'd) & Drive Final Required Prior To Co, Drive Failed 4.24.25-- 5.7.25 Mg

    Inspected by Anthony Aslan

  3. Apr 16, 2025

    Passed: Engineering - Setbacks

    Appears Within Setbacks

    Inspected by Anthony Aslan

  4. Apr 23, 2025

    Septic Release Inspection

    Drive Final Needed, Failed 4.24.25-- 5.7.25 Mg

    Inspected by Health Dept

  5. May 14, 2025

    Release to power company

    Final Drive Passed And Septice Released

    Inspected by Emaleigh Williams

  6. May 14, 2025

    Certificate-Release Certificate

    Inspected by Anthony Aslan