| Finished floor requirement |
|
| Fema map number |
12023C0290D |
| Type Roofing Job |
Partial Roof Repairs |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Remove existing shingles, eve drip and underlayment on two East facing roof facets (approx. 14 squares w/o waste).Remove and replace damaged wood decking and fascia boards.Install (where removed) new GAF FeltBuster synthetic underlayment (x2), StormGuard Ice/Water Shield on bottom eves, FHA eve drip & ridge cap.Install new aluminum soffit & fascia on damaged rake and bottom eve. |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
140 |
| No. of Stories |
1 |
| Roof Pitch |
2:12 to 4:12 |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Asphalt Shingles |
| Florida Product Approval Number |
FL10124-R25 |
| Product Manufacturer |
GAF |
| Product Description |
Shingle |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
Other (explain) |
| Sealed roof decking explanation for other option. |
Remove existing shingles, eve drip and underlayment on two East facing roof facets (approx. 14 squares w/o waste). |
| Ventilation: |
Ridge Vent |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Mineral Surface |