- Finished floor requirement
-
- Fema map number
- 12023C0311D
- Type Roofing Job
- Partial Roof Repairs
- Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
- Remove approx. 6 damaged metal roof panels, 2 rake trim and 2 transition flashing.
Remove underlying purlins, shingles, underlayment and damaged plywood.
Repair damaged trusses and install new decking, underlayment and purlins.
Install 6 new 29 gauge Dark Gray painted metal roof panels, 2 rake trim, 2 transition flashing and 1 zipper boot w/new 2” ZAC screws.
- Type of structure
- House
- Commercial or Residential
- Residential
- Roof Area (for this job) Sq Ft
- 200
- No. of Stories
- 1
- Roof Pitch
- 2:12 to 4:12
- Type of New Roofing Product
- Metal
- Florida Product Approval Number
- 36904.2
- Other Roofing Product Type Not Listed
- Metal
- Product Manufacturer
- Tri County Metal
- Product Description
- Metal
- Building Code Edition
- 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
- Sealed roof decking options: (Must select an option.)
- Other (explain)
- Sealed roof decking explanation for other option.
- Remove approx. 6 damaged metal roof panels, 2 rake trim and 2 transition flashing.
2. Remove underlying purlins, shingles, underlayment and damaged plywood.
3. Repair damaged trusses and install new decking, underlayment and purlins.
4. Install 6 new 29 gauge Dark Gray painted metal roof panels, 2 rake trim, 2 transition flashing and 1 zipper boot w/new 2” ZAC screws.
- Ventilation:
- Ridge Vent
- Flashing:
- Replace All
- Drip Edge:
- Replace All
- Valley Treatment:
- New Metal