Permit Details

Permit Search

Permit

New Residential Construction

279 SW SYDNEY NICOLE CT
LAKE CITY, FL 32024

Permit #
000051225
Application #
66742
Status Completed
  1. Submitted Sep 3, 2024
  2. Issued Oct 24, 2024
  3. Expires Jan 6, 2026
  4. Completed Jul 10, 2025

Property

Parcel #
09607-204
Owner
Hedrick Carl Michael, Hedrick Amanda Lynn
Acres
11.31
Subdivision
Melissas Secret Gardens Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
12" above adjacent ground for entire perimeter
Fema map number
12023C0485C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2456
Total Area (Sqft)
3546
Building Height
18
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0618
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Zoning Review - Reviewed
  5. Plan Review - Corrections Needed
  6. Plan Review - On Hold-Incomplete
  7. Plan Review - Building Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Plumbing Approved
  11. Plan Review - Fuel/Gas Approved
  12. Plan Review - Reviewed
  13. Final Review - Processing
  14. Final Review - Processing
  15. Final Review - Reviewed
  16. Final Review - Payment Needed
  17. Permit Issued
  18. Final Review - Complete

Contractors

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Bryan Zecher

    Bryan Zecher Construction Inc

    License
    CBC054575
    Title
    Cert.building Contractor
    Role
    Contractor

Inspections

  1. Oct 25, 2024

    Passed: Engineering - Setbacks

    Appears To Be Set With Plot Plan

    Inspected by Gary Pitzer

  2. Oct 25, 2024

    Passed: Building - Footer

    2 #5 Rebar Wired And On Chairs

    Inspected by Gary Pitzer

  3. Oct 25, 2024

    Passed: Electrical - 1st Underground Rough–In

    Rebar Bond

    Inspected by Gary Pitzer

  4. Nov 12, 2024

    Passed: Electrical - Temporary Service

    Inspected by Gary Pitzer

  5. Nov 12, 2024

    Release to power company

    Inspected by Gary Pitzer

  6. Dec 3, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Dwv Only, No Water Or Gas

    Inspected by Gary Pitzer

  7. Dec 3, 2024

    Passed: Electrical - 2nd Rough-In

    Under Slab

    Inspected by Gary Pitzer

  8. Dec 18, 2024

    Passed: Building - Slab

    Plastic Taped,wire In Slab And Steel Wired

    Inspected by Gary Pitzer

  9. Feb 25, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Gary Pitzer

  10. Feb 25, 2025

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  11. Feb 25, 2025

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  12. Feb 27, 2025

    Passed: Building - Framing

    Inspected by Gary Pitzer

  13. Feb 27, 2025

    Passed: Building - Strapping

    Inspected by Gary Pitzer

  14. Mar 24, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  15. Mar 24, 2025

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  16. Mar 24, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  17. Mar 31, 2025

    Passed: Building - Insulation

    Walls Batted

    Inspected by Gary Pitzer

  18. May 19, 2025

    Passed: Electrical - Permanent Power

    Transfer Switch As Main Discount

    Inspected by Gary Pitzer

  19. May 19, 2025

    Release to power company

    Inspected by Gary Pitzer

  20. Jun 2, 2025

    Septic Release Inspection

    Inspected by Health Dept

  21. Jul 1, 2025

    Failed: Building - Final

    + 12 Inches Around Home On Final

    Inspected by Gary Pitzer

  22. Jul 9, 2025

    Passed: Building - Final

    Photos Sent

    Inspected by Gary Pitzer

  23. Jul 10, 2025

    Passed: Certificate-Release Certificate

    Rec'd Pic - Ew

    Inspected by Gary Pitzer

Documents