Permit Details

Permit Search

Permit

New Residential Construction

3642 SW HERLONG ST
FORT WHITE, FL 32038

Permit #
000050922
Application #
66821
Status Completed
  1. Submitted Aug 27, 2024
  2. Issued Oct 1, 2024
  3. Expires Jul 14, 2026
  4. Completed Jan 15, 2026

Property

Parcel #
03815-113
Owner
Miller Dale Robert, Miller Tammie Lynne
Acres
9.76
Subdivision
Cardinal Farms Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0485C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1847
Total Area (Sqft)
2720
Building Height
15
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0872
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Service Amps
200

Status & Review History

  1. Point Review - Processing
  2. Point Review - Reviewed
  3. Zoning Review - Reviewed
  4. Plan Review - Documents Required
  5. Plan Review - Plumbing Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Electrical Approved
  8. Plan Review - Building Approved
  9. Plan Review - Reviewed
  10. Final Review - Documents Required
  11. Final Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued

Contractors

This is an owner-builder project.

  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Donald R Davis

    High Springs Electric Inc

    License
    CAC1815367
    Title
    Class B A/c
    Role
    Subcontractor
  • Marion Van Mersbergen

    Plumbing Concepts Inc

    License
    CFC1427326
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. Nov 5, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Gary Pitzer

  2. Nov 5, 2024

    Passed: Electrical - 1st Underground Rough–In

    Under Slab Electric

    Inspected by Gary Pitzer

  3. Nov 18, 2024

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  4. Nov 18, 2024

    Passed: Building - Monolithic Slab

    2#4 Rebar In Footer,plastic And Taped, Will Be Fiber Concrete

    Inspected by Gary Pitzer

  5. Dec 10, 2024

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Gary Pitzer

  6. Dec 10, 2024

    Passed: Building - Framing

    Finishing With Tightening Wall Anchors

    Inspected by Gary Pitzer

  7. Dec 10, 2024

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  8. Dec 10, 2024

    Passed: Building - Strapping

    Inspected by Gary Pitzer

  9. Dec 10, 2024

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  10. Dec 10, 2024

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Gary Pitzer

  11. Dec 10, 2024

    Cancelled: Building - Framing

    Inspected by Gary Pitzer

  12. Dec 10, 2024

    Cancelled: Building - Roof Decking

    Inspected by Gary Pitzer

  13. Dec 10, 2024

    Cancelled: Building - Strapping

    Inspected by Gary Pitzer

  14. Dec 10, 2024

    Cancelled: Building - Wall Sheathing

    Inspected by Gary Pitzer

  15. Jan 21, 2025

    Cancelled: Building - Roof Decking

    Inspected by Melissa Garber

  16. Jan 21, 2025

    Passed: Building - Wall Sheathing

    Orswall And Window Anch

    Inspected by Gary Pitzer

  17. Feb 7, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  18. Feb 7, 2025

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  19. Feb 7, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  20. Sep 15, 2025

    Passed: Electrical - Permanent Power

    Off Existing Service Near Storage Building To Transfer Switch On Home

    Inspected by Gary Pitzer

  21. Sep 16, 2025

    Release to power company

    Inspected by Gary Pitzer

  22. Sep 16, 2025

    Release to power company

    Inspected by Gary Pitzer

  23. Sep 30, 2025

    Septic Release Inspection

    Inspected by Health Dept

  24. Jan 12, 2026

    Rescheduled 1/14/2026:Building - Final

    Inspected by Tcrews

  25. Jan 14, 2026

    Passed: Building - Final

    Blower Door Test Required Prior To Co-- Rec'd 1.15.26 Mg

    Inspected by Troy Crews

  26. Jan 15, 2026

    Passed: Certificate - Release Certificate

    Blower Door Recieved

    Inspected by Crews, Malcolm T.

Documents