Permit Details

Permit Search

Permit

New Residential Construction

572 SE NATURE DR
LAKE CITY, FL 32025

Permit #
000050896
Application #
66247
Status Completed
  1. Submitted Jul 23, 2024
  2. Issued Sep 23, 2024
  3. Expires Jan 19, 2026
  4. Completed Jul 25, 2025

Property

Parcel #
08320-102
Owner
Jack Logan,
Acres
5.25
Subdivision
Eagles View Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
12" ABOVE ADJACENT GROUND FOR ENTIRE PERIMETER OF FOUNDATION
Fema map number
12023C0315C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
4587
Total Area (Sqft)
7744
Building Height
19
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0590
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
400

Status & Review History

  1. Application pending.
  2. City of Lake City Utilities Notified.
  3. Application submitted by applicant.
  4. City of Lake City Utilities Notified.
  5. Point Review - Printed-Online Application
  6. Zoning Review - Documents Required
  7. Zoning Review - Documents Required
  8. Zoning Review - Reviewed
  9. Plan Review - Building Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Mechanical Approved
  12. Plan Review - Plumbing Approved
  13. Plan Review - Fuel/Gas Approved
  14. Plan Review - Reviewed
  15. Final Review - Reviewed
  16. Final Review - Payment Needed
  17. Permit Issued
  18. Final Review - Complete

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Sep 16, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. Oct 4, 2024

    Failed: Building - Footer

    Not Ready

    Inspected by Anthony Aslan

  3. Oct 4, 2024

    Cancelled: Engineering - Setbacks

    Inspected by Anthony Aslan

  4. Oct 17, 2024

    Passed: Building - Footer

    Inspected by Anthony Aslan

  5. Oct 17, 2024

    Passed: Engineering - Setbacks

    Appears Within Setbacks

    Inspected by Anthony Aslan

  6. Oct 29, 2024

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  7. Oct 29, 2024

    Release to power company

    Inspected by Anthony Aslan

  8. Nov 19, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  9. Nov 25, 2024

    Passed: Building - Slab

    Inspected by Anthony Aslan

  10. Jan 9, 2025

    Passed: Building - Wall Sheathing

    Garage East Roof Sheathing

    Inspected by Anthony Aslan

  11. Feb 5, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  12. Feb 5, 2025

    Passed: Building - Framing

    Inspected by Troy Crews

  13. Feb 5, 2025

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  14. Feb 21, 2025

    Cancelled: Electrical - 2nd Rough-In

    Inspected by Emaleigh Williams

  15. Feb 21, 2025

    Cancelled: Mechanical - Rough In

    Inspected by Emaleigh Williams

  16. Feb 21, 2025

    Cancelled: Plumbing/Gas - 2nd Rough-In

    Inspected by Emaleigh Williams

  17. Feb 24, 2025

    Failed: Plumbing/Gas - 2nd Rough-In

    Not Ready

    Inspected by Anthony Aslan

  18. Feb 24, 2025

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  19. Feb 24, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  20. Feb 25, 2025

    Cancelled: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  21. Feb 26, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  22. Mar 4, 2025

    Passed: Building - Insulation

    Inspected by Troy Crews

  23. Mar 13, 2025

    Failed: Building - Lath/Stucco

    Work In Progress O Lath, Reschedule When Completd

    Inspected by Gary Pitzer

  24. Mar 17, 2025

    Passed: Building - Lath/Stucco

    Inspected by Gary Pitzer

  25. May 19, 2025

    Passed: Electrical - Permanent Power

    Inspected by Anthony Aslan

  26. May 19, 2025

    Release to power company

    All Requirements Met-- Ok To Release Power 5.19.25 Mg

    Inspected by Anthony Aslan

  27. May 20, 2025

    Submitted Power Release through FPL Portal

    Inspected by Garber, Melissa

  28. Jul 23, 2025

    Passed: Building - Final

    Need To Verify Master Fresh Air (received 7-25-25)

    Inspected by Anthony Aslan

Documents