| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
Need Site Plan Approval/site Plans |
Chad Williams |
9/9/2024 |
| Cancelled: Engineering - Initial Driveway |
|
Emaleigh Williams |
9/17/2024 |
| Passed: Engineering - Initial Driveway |
|
Chad Williams |
9/17/2024 |
| Passed: Engineering - Final Driveway |
Drive Constructed As Permitted, But The Outfall Of The Side Drain Has Some Erosion That Needs To Be Repaired-- Chad Spoke With Owner, Who Stated They Would Correct. Co Pending Final Ok From County Engineer-- 5.18.25 Mg-- Ok Per Chad-- 7.1.25 Mg |
Chad Williams |
1/17/2025 |
| Cancelled: Engineering - Final Driveway |
|
Troy Crews |
1/17/2025 |
| (Requested) Engineering-Final Driveway |
|
|
|
| (Requested) Engineering-Final Driveway |
|
|
|