Right-of-Way Access/Driveway
Permit
| Application #: | 66813 |
| Permit #: |
000050827 |
| Related Permit: |
|
| Submitted: | Monday, August 26, 2024 |
| Issued: | Monday, September 16, 2024 |
| Expires: | Monday, February 26, 2029 |
| Completed: | |
| Status: |
Permit Issued |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0270C |
| Standards |
Shall conform to Public Works Determinations as stated below |
| Requirements |
An 18” storm pipe of approved material 24 foot long straight ends no miters with 4 inch Limerock for cover |
| Status |
Permanent |
| Type of connection for access road |
Rural Driveway |
| Type of construction of property |
Site Built Home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
6 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Unpaved |
Review Notes
| 8/26/2024 |
Application submitted by applicant. |
| 8/26/2024 |
Pending Public Works Application Approval |
| 8/27/2024 |
Application Approved by Public Works |
| 8/29/2024 |
Final Review - Payment Needed |
| 8/29/2024 |
Pending initial driveway inspection |
| 9/16/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
8/26/2024 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
8/30/2024 |
| Passed: Engineering - Driveway Spot Check |
Starting Construction |
Smith, Blake |
2/26/2025 |
| Passed: Engineering - Driveway Spot Check |
inspection Notes: Home Under Construction |
Smith, Blake |
2/27/2026 |