| Passed: Building - Footer |
Need Picture Of Grounding Wire |
Anthony Aslan |
9/18/2024 |
| Passed: Engineering - Setbacks |
Appears To Be With In Setbacks |
Anthony Aslan |
9/18/2024 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
9/25/2024 |
| Passed: Building - Slab |
|
Anthony Aslan |
10/4/2024 |
| Passed: Building - Wall Sheathing |
|
Anthony Aslan |
10/24/2024 |
| Passed: Building - Roof Decking |
|
Anthony Aslan |
10/24/2024 |
| Passed: Building - Framing |
|
Anthony Aslan |
10/30/2024 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
10/30/2024 |
| Passed: Electrical - Temporary Service |
|
Anthony Aslan |
10/30/2024 |
| Release to power company |
|
Anthony Aslan |
10/30/2024 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
11/21/2024 |
| Failed: Mechanical - Rough In |
Exhaust Venting Not Strapped And Not Allowed Over Windows
fire Place Vent Piping Not Rated For Concealment In Attic |
Anthony Aslan |
11/21/2024 |
| Passed: Mechanical - Rough In |
Corrections Made |
Anthony Aslan |
11/26/2024 |
| Passed: Building - Insulation |
Walls Only |
Anthony Aslan |
11/26/2024 |
| Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
1/15/2025 |
| Release to power company |
Septic Rec'd |
Melissa Garber |
1/17/2025 |
| Septic Release Inspection |
|
Health Dept |
1/17/2025 |
| Passed: Building - Final |
**backflow Preventers On Hose Bibs
**blower Door And Termite Final Required Prior To Co-- 3.28.25 |
Anthony Aslan |
3/28/2025 |