Permit

Roof Replacement or Repair

294 NW BLUE BIRD GLN
WELLBORN, FL 32094

Permit #
000050753
Application #
66922
Status Completed
  1. Submitted Sep 4, 2024
  2. Issued Sep 6, 2024
  3. Expires May 19, 2025
  4. Completed Nov 20, 2024

Property

Parcel #
00174-000
Owner
George W Richardson Jr Living Trust,
Acres
208.71
Subdivision
—
Zoning
A-3
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0260C
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Remove existing metal and install new 26 gauge PBR
Type of structure
Storage or Garage Building
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
62
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Metal
Florida Product Approval Number
FL # 20147.1 R3
Product Manufacturer
CAPITAL METAL SUPPLY
Product Description
26 Ga. Capital PBR Roof Panel over open framing
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.;Other (explain)
Sealed roof decking explanation for other option.
Open purlin over part of barn. There is a section of barn that is enclosed- over this area we will be installing the bitumen strip and synthetic underlayment.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Corrections Needed
  4. Final Review - Payment Needed
  5. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. Nov 1, 2024

    Passed: Re-Roof - In Progress

    Metal Over Purlins Pole Barn

    Inspected by Matt Forsyth

  2. Nov 20, 2024

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth