Permit Details

Permit Search

Permit

Mobile Home

319 NE EVANSTON LN
LAKE CITY, FL 32055

Permit #
000050408
Application #
66115
Status Completed
  1. Submitted Jul 8, 2024
  2. Issued Jul 22, 2024
  3. Expires Feb 26, 2025
  4. Completed Aug 30, 2024

Property

Parcel #
04635-002
Owner
Tedder Richard M, Tedder Gale M
Acres
9.31
Subdivision
—
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0205D
Mobile Home is a:
Double Wide
Year Built
2025
Width (Ft.In)
28
Length (Ft.In)
44
Driveway access to home:
Existing Drive
Installation Decal #
108060
Special temporary use permit number:
STU240702
Septic #
24-0553
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
FL261000HA106092AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Zoning Review - Reviewed
  5. Plan Review - Reviewed
  6. Final Review - Payment Needed
  7. Permit Issued

Contractors

  • Kyle Johnson

    License
    IH1126657
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Jul 17, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. Aug 30, 2024

    Release to power company

    Changed From Clay To Sve

    Inspected by Melissa Garber

  3. Aug 30, 2024

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  4. Aug 30, 2024

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Gary Pitzer

  5. Aug 30, 2024

    Release to power company

    Inspected by Gary Pitzer