Permit Details

Permit Search

Permit

Right-of-Way Access/Driveway

142 SW WAVERLY LN
LAKE CITY, FL 32024

Permit #
000050405
Application #
66162
Status Completed
  1. Submitted Jul 9, 2024
  2. Issued Jul 22, 2024
  3. Expires Feb 17, 2028
  4. Completed Feb 17, 2025

Property

Parcel #
00302-011
Owner
Villar Ana M,
Acres
9.90
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
N/A
Related permit
911 Address Application

Job Details

Finished floor requirement
Fema map number
12023C0270C
Standards
Shall conform to Public Works Determinations as stated below
Requirements
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status
Permanent
Type of connection for access road
Rural Driveway
Type of construction of property
Mobile Home
Normal vehicle usage:
Automobiles
Side Drain required
Yes
Side Drain Size (diameter in inches)
18
Study Required
No
Estimated Number of Vehicle trips per day
4
Is the access for commercial or residential use?
Residential
County Road Type
Unpaved

Status & Review History

  1. Pending applicant completion and submission.
  2. Application submitted by applicant.
  3. Pending Public Works Application Approval
  4. Application Approved by Public Works
  5. Final Review - Payment Needed
  6. Pending initial driveway inspection
  7. Permit Issued
  8. New address issued and ticket completed.

Contractors

No contractors are listed on this permit.

Inspections

  1. Jul 9, 2024

    Passed: Engineering - ROW Access/Driveway connects to county maintained road

    Inspected by Chad Williams

  2. Jul 18, 2024

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  3. Aug 20, 2024

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  4. Aug 27, 2024

    Failed: Engineering - Final Driveway

    Culvert Has Not Been Installed

    Inspected by Smith, Blake

  5. Feb 17, 2025

    Passed: Engineering - Driveway Spot Check

    Needs Final Inspection

    Inspected by Smith, Blake

  6. Feb 17, 2025

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  7. Feb 17, 2025

    Passed: Engineering - Final Driveway

    Inspected by Smith, Blake