Permit Details

Permit Search

Permit

Additions

319 SW CHIPPEWA GLN
FORT WHITE, FL 32038

Permit #
000050216
Application #
65346
Status Completed
  1. Submitted May 15, 2024
  2. Issued Dec 15, 2025
  3. Expires Jun 16, 2026
  4. Completed Dec 19, 2025

Property

Parcel #
03766-124
Owner
Kimble William E, Kimble Patricia S
Acres
10.37
Subdivision
Appalachie Trace Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Meet existing structure
Fema map number
12023C0480C
Description of addition:
2 bedrooms, Bathroom, and Garage
Select driveway access to property:
Existing Drive
Fire sprinklers?
No
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setback Rear
25'
Heated Area (Sqft)
700
Total Area (Sqft)
1200
Total Estimated Cost
75000.00
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Dev Permit #
F023-
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic#
23-0756
Is this an addition for commercial or residential use?
Residential
Sealed roof decking options. (Must select one.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Point Review - Processing
  2. Point Review - Reviewed
  3. Zoning Review - Status Cleared
  4. Zoning Review - Documents Required
  5. Zoning Review - Reviewed
  6. Plan Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - Documents Required
  9. Plan Review - Documents Required
  10. Plan Review - Plumbing Approved
  11. Plan Review - Mechanical Approved
  12. Plan Review - Electrical Approved
  13. Plan Review - Building Approved
  14. Plan Review - Reviewed
  15. Final Review - Processing
  16. Permit Issued
  17. Permit Renewed
  18. Permit Renewed
  19. Permit Renewed

Contractors

This is an owner-builder project.

Inspections

  1. Jun 5, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. Jun 27, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  3. Jul 12, 2024

    Passed: Building - Monolithic Slab

    Inspected by Gary Pitzer

  4. Jul 12, 2024

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  5. Aug 15, 2024

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  6. Aug 15, 2024

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Gary Pitzer

  7. Aug 15, 2024

    Passed: Building - Framing

    Inspected by Gary Pitzer

  8. Aug 15, 2024

    Passed: Building - Rated Assembly Fastening

    Inspected by Gary Pitzer

  9. Aug 15, 2024

    Passed: Building - Strapping

    Inspected by Gary Pitzer

  10. Aug 15, 2024

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  11. Nov 7, 2024

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  12. Dec 12, 2024

    Passed: Electrical - 2nd Rough-In

    Walls Only, Partial Ceiling, Need To See Feeder Cable At The Of Insulation

    Inspected by Gary Pitzer

  13. Dec 12, 2024

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Gary Pitzer

  14. Dec 12, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  15. Dec 23, 2024

    Failed: Electrical - 2nd Rough-In

    Cable Threw Attis Has To Be Change To All Conduit Or A Cable With An Outer Approvable Shielding (ser)

    Inspected by Gary Pitzer

  16. Jan 10, 2025

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  17. Jan 10, 2025

    Cancelled: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  18. Jan 10, 2025

    Rescheduled 1/13/2025:Electrical - 2nd Rough-In

    Inspected by Melissa Garber

  19. Jan 13, 2025

    Passed: Electrical - 2nd Rough-In

    Defect Corrected

    Inspected by Gary Pitzer

  20. Dec 16, 2025

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  21. Dec 16, 2025

    Release to power company

    Inspected by Gary Pitzer

  22. Dec 18, 2025

    Passed: Building - Final

    Inspected by Gary Pitzer

Documents