Permit Details

Permit Search

Permit

New Residential Construction

1023 SW ARBOR LN
LAKE CITY, FL 32024

Permit #
000050129
Application #
65046
Status Completed
  1. Submitted May 6, 2024
  2. Issued Jun 17, 2024
  3. Expires Oct 4, 2025
  4. Completed Apr 22, 2025

Property

Parcel #
02415-000
Owner
Castagna Jerry Living Trust Dated April 11, 2023,
Acres
15.01
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0260C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2617
Total Area (Sqft)
4266
Building Height
24
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0376
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Zoning Review - Reviewed
  6. Plan Review - Documents Required
  7. Plan Review - Building Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Plumbing Approved
  11. Plan Review - Fuel/Gas Approved
  12. Plan Review - Reviewed
  13. Final Review - Documents Required
  14. Final Review - Documents Required
  15. Final Review - Documents Required
  16. Final Review - Documents Required
  17. Final Review - Documents Required
  18. Final Review - Documents Required
  19. Final Review - Documents Required
  20. Final Review - Reviewed
  21. Final Review - Payment Needed
  22. Permit Issued
  23. Final Review - Payment Needed

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Jun 25, 2024

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Jun 25, 2024

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Aug 1, 2024

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Test Stack For Underground Waste Needs To Be On The Highest End Of Fixture Served

    Inspected by Matt Forsyth

  4. Aug 2, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  5. Aug 12, 2024

    Passed: Building - Slab

    Inspected by Matt Forsyth

  6. Sep 24, 2024

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  7. Sep 24, 2024

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  8. Nov 12, 2024

    Failed: Building - Framing

    Beam That Was Cut Off Of Back Porch Improper Strapping Because Of Cut Framing Member Needs To Be Addressed

    Inspected by Matt Forsyth

  9. Nov 12, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  10. Nov 12, 2024

    Failed: Mechanical - Rough In

    Duck Board Coming Down From Ceiling We Need 3 Inches Clear For All Trades To Be Able To Work Around No Return Air In One Bedroom

    Inspected by Matt Forsyth

  11. Nov 12, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Water Supply On Pressure

    Inspected by Matt Forsyth

  12. Dec 11, 2024

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  13. Dec 11, 2024

    Release to power company

    Inspected by Matt Forsyth

  14. Dec 16, 2024

    Failed: Building - Insulation

    Insulating Contractors Not Finished

    Inspected by Matt Forsyth

  15. Dec 17, 2024

    Passed: Building - Insulation

    Are 19 Walls Spray Foam Attic

    Inspected by Matt Forsyth

  16. Jan 29, 2025

    Septic Release Inspection

    Inspected by Health Dept

  17. Feb 21, 2025

    Rescheduled 2/25/2025:Electrical - Permanent Power

    Inspected by Matt Forsyth

  18. Feb 24, 2025

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  19. Feb 24, 2025

    Release to power company

    Inspected by Matt Forsyth

  20. Apr 4, 2025

    Failed: Building - Final

    Need Access To Attic Space Final Termite And Fixtures Finished Installed

    Inspected by Matt Forsyth

  21. Apr 7, 2025

    Passed: Building - Final

    Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents.

    Inspected by Matt Forsyth

  22. Apr 22, 2025

    Certificate-Release Certificate

    Inspected by Matt Forsyth

Documents