Roof Replacement or Repair
Permit
| Application #: | 65753 |
| Permit #: |
000050084 |
| Related Permit: |
|
| Submitted: | Friday, June 7, 2024 |
| Issued: | Monday, June 10, 2024 |
| Expires: | Monday, September 23, 2024 |
| Completed: | Monday, September 23, 2024 |
| Status: |
Completed |
| Septic Release? |
N/A |
Notes
PICS AND AFFIDAVIT REC'D
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0215D |
| Type Roofing Job |
Replacement - Tear off Existing and Replace |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Tear off existing roof and install new TPO |
| Type of structure |
Mobile Home |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
1100 |
| No. of Stories |
1 |
| Roof Pitch |
Less than 2:12 |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Flat or Membrane type |
| Florida Product Approval Number |
FL5293-R57 |
| Product Manufacturer |
GAF |
| Product Description |
Thermoplastic polyolefin roofing systems |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof. |
| Ventilation: |
Unvented |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Mineral Surface |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 6/7/2024 |
Application pending. |
| 6/7/2024 |
Application submitted by applicant. |
| 6/10/2024 |
Final Review - Payment Needed |
| 6/10/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Daniel Dufresne Covenant Roofing & Construction Inc
|
CCC1332763 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
Installing Foam Insulation Panels And Preparing Roof For Membrane |
Gary Pitzer |
7/3/2024 |
| Failed: Re-Roof - Final |
Customer Very Unhappy With Roof Covering Job. He Had A Low Area In Roof That The New Covering Was To Fix For Drainage. Owner Spent Yesterday In Rain Pushing Water Off Roof With A Broom During Rain Storm. Owner States That The Contractors Were Aware Of This We He Agreed To The Project. |
Gary Pitzer |
7/8/2024 |
| Failed: Re-Roof - Final |
Can't Confirm Broken Trusses Ceiling Still Intact, Owner States Built In Slope On Center Portion Of Home Agreed To Before Job. Advised Owner To Leave Supports In Place And Have Evaluated By Professional
after Roof Is Completed. Owner Has Pictures Of Ponding Water In Said Area. |
Troy Crews |
8/2/2024 |
| Failed: Re-Roof - Final |
Previous Approval Was In Mistake. Awaiting Phone Call From Owner To Check On Situation. |
Troy Crews |
9/23/2024 |
| Passed: Re-Roof - Final |
Spoke To Owner On 9-23-24 15:58 P.m. He Indicated They Had Done Some Work And Ok To Close Permit. |
Troy Crews |
9/23/2024 |