Permit Details

Permit Search

Permit

Right-of-Way Access/Driveway

460 SW MARYNIK DR
HIGH SPRINGS, FL 32643

Permit #
000049932
Application #
65372
Status Completed
  1. Submitted May 15, 2024
  2. Issued Aug 20, 2024
  3. Expires Aug 18, 2028
  4. Completed Aug 19, 2025

Property

Parcel #
10006-213
Owner
Mcalhany Martin J, Mcalhany Rebekah C
Acres
5.33
Subdivision
River Rise Residential Unit 1
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
911 Address Application

Job Details

Finished floor requirement
Fema map number
12023C0513C
Standards
Shall conform to Public Works Determinations as stated below
Requirements
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status
Permanent
Type of connection for access road
Rural Driveway
Type of construction of property
Site Built Home
Normal vehicle usage:
Automobiles;Trucks
Side Drain required
Yes
Side Drain Size (diameter in inches)
18
Study Required
No
Construction Material Type
Concrete
Estimated Number of Vehicle trips per day
5
Is the access for commercial or residential use?
Residential
County Road Type
Paved

Status & Review History

  1. Pending applicant completion and submission.
  2. Application submitted by applicant.
  3. Pending Public Works Application Approval
  4. Application Approved by Public Works
  5. Final Review - Payment Needed
  6. Pending initial driveway inspection
  7. Permit Issued
  8. New address issued and ticket completed.
  9. Permit Renewed
  10. Permit Reissued

Contractors

No contractors are listed on this permit.

Inspections

  1. May 15, 2024

    Passed: Engineering - ROW Access/Driveway connects to county maintained road

    Inspected by Chad Williams

  2. May 22, 2024

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  3. Nov 20, 2024

    Passed: Engineering - Driveway Spot Check

    Home Is Under Construction

    Inspected by Smith, Blake

  4. Aug 19, 2025

    Passed: Engineering - Final Driveway

    Inspected by Beach, Garrett