Permit Details

Permit Search

Permit

Roof Replacement or Repair

770 NE CEMETERY LOOP
LAKE CITY, FL 32055

Permit #
000049920
Application #
65493
Status Completed
  1. Submitted May 22, 2024
  2. Issued May 23, 2024
  3. Expires Nov 27, 2024
  4. Completed May 31, 2024

Property

Parcel #
04626-000
Owner
Sollee Richard P, Dds, Sollee Dorothy H
Acres
57.42
Subdivision
—
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0205D
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
1300
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL10124-R28
Product Manufacturer
GAF
Product Description
Architectural Shingles
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Antonino Milian

    Endless Summer Roofing Co

    License
    CCC1326548
    Title
    Cert. Roofing
    Role
    Contractor

Inspections

  1. May 29, 2024

    Passed: Re-Roof - In Progress

    Tear Off Complete, Repairing A Few Square Ft Of Deck, Nail Off And Underlayment Starting

    Inspected by Gary Pitzer

  2. May 31, 2024

    Passed: Re-Roof - Final

    Inspected by Gary Pitzer