Permit Details

Permit Search

Permit

Right-of-Way Access/Driveway

684 NW INDIAN RIDGE LN
LAKE CITY, FL 32055

Permit #
000049804
Application #
65236
Status Completed
  1. Submitted May 8, 2024
  2. Issued Jul 23, 2024
  3. Expires Aug 22, 2027
  4. Completed Aug 22, 2024

Property

Parcel #
01809-118
Owner
Frier Finance, Inc,
Acres
4.75
Subdivision
—
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
N/A
Related permit
Mobile Home: 000049806

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0190D
Building Permit #
000049806
Standards
Shall conform to Public Works Determinations as stated below
Requirements
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status
Permanent
Type of construction of property
Mobile Home
Normal vehicle usage:
Automobiles
Side Drain required
Yes
Side Drain Size (diameter in inches)
18
Study Required
No
Construction Material Type
Limerock/Gravel/Millings
Is the access for commercial or residential use?
Residential
County Road Type
Paved

Status & Review History

  1. Pending Public Works Application Approval
  2. Application Approved by Public Works
  3. Final Review - Payment Needed
  4. Permit Issued
  5. Permit Reissued

Contractors

  • Dale Houston

    Dale Houstons Mobile Home Set Up And Service

    License
    IH1133271
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Dale Houston

    Dale Houstons Mobile Home Set Up And Service

    License
    IH1133271
    Title
    Mh Installer (ih)
    Role
    Subcontractor
  • Dale Houston

    Dale Houstons Mobile Home Set Up And Service

    License
    IH1133271
    Title
    Mh Installer (ih)
    Role
    Subcontractor

Inspections

  1. May 8, 2024

    Passed: Engineering - ROW Access/Driveway connects to county maintained road

    Inspected by Chad Williams

  2. May 13, 2024

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  3. Aug 22, 2024

    Passed: Engineering - Final Driveway

    Inspected by Smith, Blake

  4. Aug 22, 2024

    Cancelled: Engineering - Spot Check

    Inspected by Melissa Garber

  5. Aug 22, 2024

    Cancelled: Engineering - Spot Check

    Inspected by Melissa Garber

  6. Aug 22, 2024

    Cancelled: Engineering - Spot Check

    Inspected by Melissa Garber