Permit Details

Permit Search

Permit

New Residential Construction

504 SW PHOENIX GLN
FORT WHITE, FL 32038

Permit #
000049617
Application #
64388
Status Permit Renewed
  1. Submitted Feb 29, 2024
  2. Issued Oct 5, 2026
  3. Expires Oct 5, 2027
  4. Completed —

Property

Parcel #
04171-001
Owner
George M Strawder Jr,
Acres
5.05
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Permit Renewed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0490C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2101
Total Area (Sqft)
3624
Building Height
15
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0285
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Plan Review - Building Approved
  2. Plan Review - Electrical Approved
  3. Plan Review - Mechanical Approved
  4. Plan Review - Plumbing Approved
  5. Plan Review - Fuel/Gas Approved
  6. Plan Review - Reviewed
  7. Point Review - Reviewed
  8. Zoning Review - Reviewed
  9. Final Review - Documents Required
  10. Final Review - Documents Required
  11. Final Review - Documents Required
  12. Final Review - Documents Required
  13. Final Review - Documents Required
  14. Final Review - Reviewed
  15. Final Review - Payment Needed
  16. Final Review - Payment Needed
  17. Permit Issued
  18. Point Review - Reviewed
  19. Permit Renewed
  20. Permit Renewed

Contractors

This is an owner-builder project.

  1. Aug 6, 2024

    Rescheduled 8/7/2024:Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  2. Aug 7, 2024

    Failed: Plumbing/Gas - 1st Underground Rough–In

    No Water Test On Drain Or Supply Lines need Permit Box With Noc Posted

    Inspected by Anthony Aslan

  3. Aug 9, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  4. Aug 20, 2024

    Failed: Building - Slab

    No Termite Treatment

    Inspected by Anthony Aslan

  5. Sep 30, 2024

    Failed: Building - Roof Decking

    No Slab Inspection Preformed. slab Inspection Was Failed Due To No Termite Treatment Posted Or In Permit Box

    Inspected by Anthony Aslan

  6. Oct 15, 2024

    Cancelled: Building - Slab

    Inspected by Anthony Aslan

  7. Oct 15, 2024

    Passed: Building - Monolithic Slab

    Looked At 8-20-24 Need Termite Spray Slip Received

    Inspected by Anthony Aslan

  8. Oct 15, 2024

    Passed: Engineering - Setbacks

    Appears To Be Within Setbacks

    Inspected by Anthony Aslan

  9. Oct 15, 2024

    Passed: Building - Roof Decking

    Looked At 9-30-24

    Inspected by Anthony Aslan

  10. Oct 15, 2024

    Passed: Building - Wall Sheathing

    Looked At 9-30-24

    Inspected by Anthony Aslan

  11. Oct 15, 2024

    Passed: Building - Framing

    Inspected by Anthony Aslan

  12. Oct 15, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  13. Nov 27, 2024

    Cancelled: Building - Roof Decking

    Inspected by Anthony Aslan

  14. Mar 27, 2025

    Passed: Building - Spot Check

    Inspected by Anthony Aslan

  15. May 2, 2025

    Passed: Electrical - 2nd Rough-In

    Needs To Be Cleaned Up By Mechanical Inspection personal Effects Need To Be Stored Out Of Area Of Inspection

    Inspected by Anthony Aslan

  16. Jul 11, 2025

    Passed: Mechanical - Rough In

    Need Boots Sealed By Gasket Before Sheetrock Or Seal Boots To Sheetrock

    Inspected by Anthony Aslan

  17. Oct 6, 2026

    Passed: Electrical - Permanent Power

    Pending Septic Final

    Inspected by Christian Allen

  18. Oct 14, 2026

    Release to power company

    Rec'd Septic Final 10/14

    Inspected by Ewilliams

  19. Oct 19, 2026

    Septic Release Inspection

    Inspected by Health Dept