Permit Details

Permit Search

Permit

New Residential Construction

292 SW GREENWOOD TER
FORT WHITE, FL 32038

Permit #
000049529
Application #
64127
Status Completed
  1. Submitted Feb 15, 2024
  2. Issued Jun 7, 2024
  3. Expires Aug 16, 2025
  4. Completed Feb 18, 2025

Property

Parcel #
04056-131
Owner
Patel Kaushikkumar, Patel Anitaben
Acres
1.23
Subdivision
Thornwood
Zoning
—
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
1' ABOVE ADJACENT GROUND FOR ENTIRE PERIMETER
Fema map number
12023C0490C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2669
Total Area (Sqft)
3702
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0056
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Plan Review - Documents Required
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Fuel/Gas Approved
  9. Plan Review - Reviewed
  10. Point Review - Reviewed
  11. Zoning Review - Documents Required
  12. Zoning Review - Documents Required
  13. Zoning Review - Reviewed
  14. Final Review - Processing
  15. Final Review - Reviewed
  16. Final Review - Payment Needed
  17. Final Review - Payment Needed
  18. Permit Issued
  19. Permit Reissued
  20. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

Inspections

  1. Apr 17, 2024

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  2. Apr 17, 2024

    Release to power company

    Inspected by Anthony Aslan

  3. Apr 17, 2024

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  4. Apr 17, 2024

    Passed: Building - Footer

    Inspected by Anthony Aslan

  5. May 29, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  6. Jun 28, 2024

    Passed: Building - Slab

    Inspected by Anthony Aslan

  7. Aug 12, 2024

    Passed: Building - Ext Strapping/Wall Sheathing

    Need Pictures Of Garage End Wall

    Inspected by Anthony Aslan

  8. Aug 12, 2024

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  9. Aug 19, 2024

    Passed: Building - Framing

    Check Doomer Blocking & Strapping

    Inspected by Anthony Aslan

  10. Sep 11, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  11. Sep 11, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  12. Sep 11, 2024

    Passed: Mechanical - Rough In

    Master Bath Exhaust Fan Over Window

    Inspected by Anthony Aslan

  13. Sep 16, 2024

    Passed: Building - Insulation

    Walls & Ceiling Spray Foam

    Inspected by Anthony Aslan

  14. Dec 30, 2024

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Anthony Aslan

  15. Jan 3, 2025

    Release to power company

    Inspected by Melissa Garber

  16. Jan 3, 2025

    Septic Release Inspection

    Inspected by Health Dept

  17. Jan 30, 2025

    Cancelled: Building - Roof Decking

    Inspected by Melissa Garber

  18. Jan 30, 2025

    Cancelled: Building - Framing

    Inspected by Melissa Garber

  19. Feb 3, 2025

    Failed: Building - Final

    Check All Outdoor Gfci Plugs And Complete Front Porch Project

    Inspected by Troy Crews

  20. Feb 17, 2025

    Passed: Building - Final

    Inspected by Anthony Aslan

  21. Feb 18, 2025

    Certificate-Release Certificate

    Inspected by Anthony Aslan

Documents