Permit Details

Permit Search

Permit

Roof Replacement or Repair

119 SW QUINCY TER
LAKE CITY, FL 32024

Permit #
000049444
Application #
64507
Status Completed
  1. Submitted Mar 11, 2024
  2. Issued Mar 18, 2024
  3. Expires Sep 28, 2024
  4. Completed Apr 1, 2024

Property

Parcel #
03153-043
Owner
Heringer Jason
Acres
0.86
Subdivision
Piccadilly Park Replat Unr
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0381D
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Roof Area (for this job) Sq Ft
25.60
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL10124_R35
Product Manufacturer
GAF
Product Description
Timberline HDZ
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Mineral Surface

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Final Review - Corrections Needed
  5. Permit Issued

Contractors

  • Joel Dantzler Jr

    The Dantzler Group Inc

    License
    CCC057181
    Title
    Cert. Roofing
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Mar 26, 2024

    Passed: Re-Roof - In Progress

    Work In Progress With Removal, Nailing And Startin Underlayment

    Inspected by Gary Pitzer

  2. Apr 1, 2024

    Passed: Culvert - Access Road/Driveway Right-of-Way Integrity Inspection

    Inspected by Gary Pitzer

  3. Apr 1, 2024

    Passed: Re-Roof - Final

    Inspected by Gary Pitzer