Permit Details

Permit Search

Permit

New Residential Construction

504 SW CIRRUS DR
LAKE CITY, FL 32025

Permit #
000049436
Application #
63969
Status Completed
  1. Submitted Jan 24, 2024
  2. Issued Mar 15, 2024
  3. Expires Jun 16, 2025
  4. Completed Dec 19, 2024

Property

Parcel #
09322-017
Owner
Libby Douglas, Libby Barbara Lee
Acres
4.04
Subdivision
Lake City Airpark
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0415C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2101
Total Area (Sqft)
6635
Building Height
25
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0081
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
400

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Fuel/Gas Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Final Review - Documents Required
  12. Final Review - Processing
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Final Review - Payment Needed
  16. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Apr 2, 2024

    Electrical -1st Underground Rough–In

    Electric Steel Bond

    Inspected by Gary Pitzer

  2. Apr 2, 2024

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  3. Apr 2, 2024

    Passed: Building - Footer

    2#5 Wired On Chairs

    Inspected by Gary Pitzer

  4. Apr 9, 2024

    Passed: Electrical - Temporary Service

    Service With One Gfci Outlet

    Inspected by Gary Pitzer

  5. Apr 9, 2024

    Release to power company

    Inspected by Gary Pitzer

  6. Apr 30, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  7. May 7, 2024

    Passed: Building - Monolithic Slab

    Porches House

    Inspected by Anthony Aslan

  8. May 7, 2024

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  9. May 7, 2024

    Passed: Building - Slab

    Main House Slab

    Inspected by Anthony Aslan

  10. May 21, 2024

    Passed: Building - Monolithic Slab

    Hanger Slab

    Inspected by Anthony Aslan

  11. May 21, 2024

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  12. Jun 21, 2024

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  13. Jun 21, 2024

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  14. Jul 2, 2024

    Passed: Building - Framing

    Inspected by Anthony Aslan

  15. Jul 19, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  16. Jul 19, 2024

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  17. Jul 19, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  18. Jul 23, 2024

    Passed: Building - Insulation

    Walls Batts R13

    Inspected by Gary Pitzer

  19. Oct 30, 2024

    Septic Release Inspection

    Inspected by Health Dept

  20. Nov 15, 2024

    Failed: Electrical - Permanent Power

    1. Support Conduits Under Panel, 2. Ko Seal In Exterior Disconnect, Bonding Screw

    Inspected by Gary Pitzer

  21. Nov 19, 2024

    Passed: Electrical - Permanent Power

    Inspected by Anthony Aslan

  22. Nov 19, 2024

    Release to power company

    Inspected by Anthony Aslan

  23. Dec 18, 2024

    Passed: Building - Final

    Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents.

    Inspected by Anthony Aslan

  24. Dec 19, 2024

    Certificate-Release Certificate

    Received Documents

    Inspected by Anthony Aslan

Documents